[1] Gupta J N D. Two-stage, hybrid flowshop scheduling problem[J]. Journal of the Operational Research Society, 1988, 39(4): 359-364. [2] 姚远远,叶春明,杨枫.双目标可重入混合流水车间调度问题的离散灰狼优化算法[J].运筹与管理,2019,28(8):190-199. [3] 轩华,李冰,罗书敏,等.基于总加权完成时间的可重入混合流水车间调度问题[J].控制与决策,2018,33(12):2218-2226. [4] Xuan H, Zhang H X, Li B. An improved discrete artificial bee colony algorithm for flexible flowshop scheduling with step deteriorating jobs and sequence-dependent setup times[J]. Mathematical Problems in Engineering, Volume 2019, Article ID 8520503, 13 pages. [5] Chamnanlor C, Sethanan K, Gen M, et al. Embedding ant system in genetic algorithm for re-entrant hybrid flow shop scheduling problems with time window constraints[J]. Journal of Intelligent Manufacturing, 2017, 28(8): 1915-1931. [6] Eskandari H, Hosseinzadeh A. A variable neighbourhood search for hybrid flow-shop scheduling problem with rework and set-up times[J]. Journal of the Operational Research Society, 2014, 65(8): 1221-1231. [7] Zhang X Y, Chen L. Heuristics for minimizing the total tardiness in a re-entrant hybrid flow shop with non-identical machines in parallel[C]. International Conference on Industrial Engineering and Engineering Management, 2016, 987-991. [8] Geng K F, Ye C M, Dai Z H, et al. Bi-objective re-entrant hybrid flow shop scheduling considering energy consumption cost under time-of-use electricity tariffs[J]. Complexity, Volume 2020, Article ID 8565921, 17 pages. [9] Li Y L, Li X Y, Gao L, et al. A discrete artificial bee colony algorithm for distributed hybrid flowshop scheduling problem with sequence-dependent setup times[J]. International Journal of Production Research, 2020, 59(13): 3880-3899. [10] Li J Q, Duan P Y, Sang H Y, et al. An efficient optimization algorithm for resource-constrained steelmaking scheduling problems[J]. IEEE Access, 2018, 6: 33883-33894. [11] Kheirandish O, Tavakkoli-Moghaddam R, Karimi-Nasab M. An artificial bee colony algorithm for a two-stage hybrid flowshop scheduling problem with multilevel product structures and requirement operations[J]. International Journal of Computer Integrated Manufacturing, 2015, 28(5): 437-450. [12] 李俊青,潘全科,王法涛.求解混合流水线调度问题的离散人工蜂群算法[J].运筹与管理,2015,24(1):157-163. [13] 张维存,左天帅,张博涵.考虑有限缓存区的Job Shop加工与搬运集成调度[J].运筹与管理,2020,29(11):213-222. [14] Peng K K, Pan Q K, Gao L, et al. An improved artificial bee colony algorithm for real-world hybrid flowshop rescheduling in steelmaking-refining continuous casting process[J]. Computers & Industrial Engineering, 2018, 122: 235-250. [15] Zhang B, Pan Q K, Gao L, et al. A multiobjective evolutionary algorithm based on decomposition for hybrid flowshop green scheduling problem[J]. Computers & Industrial Engineering, 2019, 136: 325-344. |