[1] 张立辉,乞建勋,佟鹤晶.CPM网络中机动时间的使用效率及应用[J].运筹与管理,2009,18(1):109-114. [2] Zhang L H, Qi J X. Controlling path and controlling segment analysis in RSM[J]. Journal of Construction Engineering and Management, 2012, 138(11): 1341-1345. [3] Harris R B, Ioannou P G. Scheduling projects with repeating activities[J]. Journal of Construction Engineering and Management, 1998, 124(4): 269-278. [4] Kallantzis A, Lambropoulos S. Correspondence of activity relationships and critical path between time-location diagrams and CPM[J]. Operational Research, 2004, 4(3): 277-290. [5] Kallantzis A, Soldatos J, Lambropoulos S. Linear versus network scheduling: a critical path comparison[J]. Journal of Construction Engineering and Management, 2007, 133(7): 483-491. [6] Yamín R A, Harmelink D J. Comparison of linear scheduling model(LSM)and critical path method(CPM)[J]. Journal of Construction Engineering and Management, 2001, 127(5): 374-381. [7] Arditi D, Tokdemir O B, Suh K. Effect of learning on line-of-balance scheduling[J]. International Journal of Project Management, 2001, 19(5): 265-277. [8] O’Brien, J J. VPM scheduling for high-rise buildings[J]. Journal of the Construction Division, ASCE, 1975, 101(4): 895-905. [9] Harmelink D J, Rowings J E. Linear scheduling model: development of controlling activity path[J]. Journal of Construction Engineering and Management, 1998, 124(4): 263-268. [10] 钱昆润,葛筠圃.建筑施工组织与计划[M].南京:东南大学出版社,1989. [11] 蒋根谋,熊燕.线性计划方法及其应用研究[J].华东交通大学学报,2008,25(5):8-11. [12] Kallantzis A, Lambropoulos S. Critical path determination by incorporating minimum and maximum time and distance constrains into linear scheduling[J]. Engineering Construction and Architectural Management, 2004, 11(3): 211-222. [13] Ammar M A, Elbeltagi E. Algorithm for determining controlling path considering resource continuity[J]. Journal of Computing in Civil Engineering, 2001, 15(4): 292-298. [14] Harmelink D J. Linear scheduling model: float characteristics[J]. Journal of Construction Engineering and Management, 2001, 127(4): 255-260. [15] Lucko G, Pena Orozco A A. Float types in linear schedule analysis with singularity functions[J]. Journal of Construction Engineering and Management, 2009, 135(5): 368-377. [16] Mattila K G, Abraham D M. Resource leveling of linear schedules using integer linear programming[J]. Journal of Construction Engineering and Management, 1990, 124(3): 232-244. [17] Elmaghraby S E, Kamburowski J. The analysis of activity network under generalized precedence relations[J]. Management Science, 1992, 38(9): 1245-1263. |