[1] 蒋伟, 盛文, 杨莉, 范云龙.视情维修条件下相控阵雷达备件优化配置[J].系统工程与电子技术, 2017, 39(9):2052-2057. [2] 张永强, 徐宗昌, 呼凯凯, 胡春阳.k/N系统维修时机与备件携行量联合优化[J].北京航空航天大学学报, 2016, 42(10):2189-2197. [3] Keizer M C A O, Teunter R H, Veldman J. Joint condition-based maintenance and inventory optimization for systems with multiple components[J]. European Journal of Operational Research, 2016, 257(1): 209-222. [4] 张晓红, 白志霞, 王潇炜, 黄景立, 蔺占芳, 甘婕.智能电表最优更换及备件库存联合决策[J].运筹与管理, 2018, 27(10):70-75. [5] 赵斐, 刘学娟.考虑不完美维修的定期检测与备件策略联合优化[J].系统工程理论与实践, 2017, 37(12):3201-3214. [6] Jonge B D, Scarf P A. A review on maintenance optimization[J]. European Journal of Operational Research, 2020, 285(3): 805-824. [7] Zhang Y, Shen J, Ma Y. An optimal preventive maintenance policy for a two-stage competing-risk system with hidden failures[J]. Computers & Industrial Engineering, 2021, 154: 107135. [8] Qiu Q, Cui L, Shen J, Yang L. Optimal maintenance policy considering maintenance errors for systems operating under performance-based contracts[J]. Computers and Industrial Engineering, 2017, 112: 147-155. [9] Zhang F, Shen J, Liao H, et al. Optimal preventive maintenance policy for a system subject to two-phase imperfect inspections[J]. Reliability Engineering and System Safety, 2020, 205: 107254. [10] Wang H, Wang W, Peng R. A two-phase inspection model for a single component system with three-stage degradation[J]. Reliability Engineering and System Safety, 2017, 158(2): 31-40. [11] Wang W. A joint spare part and maintenance inspection optimisation model using the Delay-Time concept[J]. Reliability Engineering and System Safety, 2011, 96(11): 1535-1541. [12] Wang W. A stochastic model for joint spare parts inventory and planned maintenance optimization[J]. European Journal of Operational Research, 2012, 216(1): 127-139. [13] Berrade M D, Cavalcante C A V, Scarf P A. Maintenance scheduling of a protection system subject to imperfect inspection and replacement[J]. European Journal of Operational Research, 2012, 218(3): 716-725. [14] Zhao F, Xie F, Shi C, Kang J. A joint inspection-based preventive maintenance and spare ordering optimization policy using a three-stage failure process[J]. Complexity, 2017, 2017: 1-19. [15] Zhao F, Liu X, Peng R, Kang J. Joint optimization of inspection and spare ordering policy with multi-level defect information[J]. Computers & Industrial Engineering, 2020, 139: 106205. [16] Wang W. An inspection model based on a three-stage failure process[J]. Reliability Engineering and System Safety, 2011, 96(7): 838-848. [17] 王文斌, 赵斐, 彭锐.基于三阶段故障过程的多重点检策略优化模型[J].系统工程理论与实践, 2014, 34(01):223-232. [18] Seyedhossein S M, Moakedi H, Shahanaghi K. Imperfect inspection optimization for a two-component system subject to hidden and two-stage revealed failures over a finite time horizon[J]. Reliability Engineering and System Safety, 2018, 174(6): 141-156. [19] Yang L, Ye Z, Lee C, Yang S, Peng R. A two-phase preventive maintenance policy considering imperfect repair and postponed replacement[J]. European Journal of Operational Research, 2019, 274(3): 966-977. [20] Zhang F, Shen J, Ma Y. Optimal maintenance policy considering imperfect repairs and non-constant probabilities of inspection errors[J]. Reliability Engineering and System Safety, 2020, 193: 106615. [21] Ross S M. Renewal theory and its applications[M]. Introduction to Probability Models, 2014. 409-479. |