工件优先级图为非连接图且含环的单机总加权拖期调度问题
轩华, 刘静, 李冰
Single Machine Total Weighted Tardiness Scheduling with Unconnected Precedence Graph and Loop Constraints
XUAN Hua, LIU Jing, LI Bing
运筹与管理 . 2014, (2): 244 -249 .