考虑机器调整次数和产品质量的卷烟批量计划和柔性流水车间调度集成问题
柴剑彬, 刘赫, 贝晓强
Integrated Problem for Lot Sizing and Flexible Flow Shop Scheduling Problem in the Tobacco Industry Considering Setup times and Cigarette Quality
CHAI Jian-bin, LIUHe, BEI Xiao-qiang
运筹与管理
.
2019, (10): 165
-174
.
DOI: 10.12005/orms.2019.0237