离散流水线车间内交货期与鲁棒性及能耗成本的集成优化
崔维伟, 蒋诚仁, 刘新波
Integrated Optimization of Makespan, Robustness and Energy Cost for the Flow Shop in Manufacturing Plant
CUI Weiwei, JIANG Chengren, LIU Xinbo
运筹与管理 . 2024, (8): 58 -64 .  DOI: 10.12005/orms.2024.0251