装配式建筑项目随机调度与构件订购联合优化
王静静, 刘慧敏, 董文杰, 王宗喜
Joint Optimization of Stochastic Project Scheduling and Component Ordering for Prefabricated Buildings
WANG Jingjing, LIU Huimin, DONG Wenjie, WANG Zongxi
运筹与管理
.
2025, (9): 53
-60
.
DOI: 10.12005/orms.2025.0275