考虑维修时间的总质保需求预测模型
张瑞洁,钟远光,谢维
Total Warranty Demand Forecasting Considering the Repair Time
ZHANG Rui-jie, ZHONG Yuan-guang, XIE Wei
运筹与管理 . 2019, (5): 108 -116 .  DOI: 10.12005/orms.2019.0110