兼顾成本与时间保证率的泊位及岸桥协同调度优化
宋云婷, 王诺, 吴暖
Optimization of Berth and Quay Crane Collaborative Scheduling Considering Both the Cost and Time Guarantee Rate
SONG Yun-ting, WANG Nuo, WU Nuan
运筹与管理 . 2020, (4): 130 -137 .  DOI: 10.12005/orms.2020.0099