[1] Murthy D N P, Pongpech J. Maintenance of leased equipment[M]. Complex System Maintenance Handbook.Springer London, 2008: 395-415. [2] Pham H, Wang H. Imperfect maintenance[J]. European journal of operational research, 1996, 94(3): 425-438. [3] Shafiee M, Chukova S. Maintenance models in warranty: a literature review[J]. European Journal of Operational Research, 2013, 229(3): 561-572. [4] 张晓爽,孟宪云,贾鹏茹,等.基于修理设备的冷贮备可修系统的维修策略[J].运筹与管理,2011,(3):150-155. [5] Nakagawa T. A summary of periodic replacement with minimal repair at failure[J]. Journal of the Operations Research Society of Japan, 1981, 24(3): 213-228. [6] Wang H. A survey of maintenance policies of deteriorating systems[J]. European Journal of Operational Research, 2002, 139(3): 469-489. [7] Jaturonnatee J, Murthy D N P, Boondiskulchok R. Optimal preventive maintenance of leased equipment with corrective minimal repairs[J]. European Journal of Operational Research, 2006, 174(1): 201-215. [8] Pongpech J, Murthy D N P. Optimal periodic preventive maintenance policy for leased equipment[J]. Reliability Engineering & System Safety, 2006, 91(7): 772-777. [9] Yeh R H, Kao K C, Chang W L. Optimal preventive maintenance policy for leased equipment using failure rate reduction[J]. Computers & Industrial Engineering, 2009, 57(1): 304-309. [10] Yeh R H, Chang W L. Optimal threshold value of failure-rate for leased products with preventive maintenance actions[J]. Mathematical and Computer Modelling, 2007, 46(5): 730-737. [11] Yeh R H, Chang W L, Lo H C. Optimal length of lease period and maintenance policy for leased equipment with a control-limit on age[J]. Mathematical and Computer modelling, 2011, 54(9): 2014-2019. [12] Cheng C Y, Zhao X F, Chen M, et al. A Failure-rate-reduction periodic preventive maintenance model with delayed initial time in a finite time period[J]. Quality Techonlogy & Quantitative Management, 2014,11(3): 245-254. [13] Zhou X, Li Y, Xi L, et al. Multi-phase preventive maintenance policy for leased equipment[J]. International Journal of Production Research, 2014: 1-10. [14] 金琳,黄开敏,周晓军.租赁设备的多阶段预防性维护策略及优化[J].计算机集成制造系统,2013,19(12):2947-2953. [15] Coria V H, Maximov S, Rivas-Dávalos F, et al. Analytical method for optimization of maintenance policy based on available system failure data[J]. Reliability Engineering & System Safety, 2015, 135: 55-63. [16] Melchor-Hernández C L, Rivas-Dávalos F, Maximov S, et al. A model for optimizing maintenance policy for power equipment[J]. International Journal of Electrical Power & Energy Systems, 2015, 68: 304-312. [17] Melchor-Hernández C L, Rivas-Dávalos F, Maximov S, et al. An analytical method to estimate the weibull parameters for assessing the mean life of power equipment[J]. International Journal of Electrical Power & Energy Systems, 2015, 64: 1081-1087. |