[1] 谭民.CIMS串行生产线可靠性建模与分析的研究[J].控制与决策,1993,6:401-408. [2] Meller R D, Kim D, S. The impact of preventive maintenance on system cost and buffer size[J]. European Journal of Operational Research, 1996, 95(3): 577-591. [3] Iravani M R, Duenyas I. Integrated maintenance and production control of a deteriorating production system[J]. IIE Transactions, 2002, 34(5): 423-435. [4] Zequeira R I, Prida B, Valdes J E. Optimal buffer inventory and preventive maintenance for an imperfective production process[J]. International Journal of Production Research, 2004, 42(5): 959-974. [5] Bouslah B, Gharbi A, Pellerin R. Joint optimal lot sizing and production control policy in an unreliable and imperfect manufacturing system[J]. International Journal of Production Economics, 2013, 144(1): 143-156. [6] Yevkin O, Krivtsov V. Comparative analysis of optimal maintenance policies under general repair with underlying weibull distributions[J]. IEEE Transactions on Reliability, 2013, 62(1): 82-91. [7] 严正峰,刘猛.带有中间缓冲区的生产系统设备维修策略研究[J].组合机床与自动化加工技术,2015,9:81-85. [8] 周瑜,寇纲,尔古打机.考虑维修效果与计划水平的预防维修决策优化[J].系统工程学报,2015,2:281-288. [9] 张晓红,曾建潮.设备视情预防维修与备件订购策略的联合优化[J].机械工程学报,2015,11:150-158. [10] 梁佩,王少华,董心洁,菅凌霄.串行生产线预防维修可靠性研究[J].机械设计与制造,2015,8:249-252. [11] 郑睿,吕文元.考虑故障停机的生产控制与维修计划联合决策模型[J].中国管理科学,2016,8:116-122. [12] Wang H, Pham H. A quasi-renewal process and its applications in imperfect maintenance[J]. International Journal of System Science. 1996, 10(27): 1055-1062. [13] 董克,吕文元.基于历史故障数据的租赁设备预防维护策略优化[J].运筹与管理,2017,26(5):119-124. |