[1] Li L. Automatic dense warehouse apparatus: U.S. Patent Application 15/499,107[P].2017-8-10.
[2] Kaukl C V, Cai X, Bhat A S. High density automated storage and retrieval system: U.S. Patent Application 15/787,597[P]. 2018-5-17.
[3] Yu Y G, de Koster R B M. Optimal zone boundaries for two-class-based compact three-dimensional automated storage and retrieval systems[J]. IIE Transactions, 2009, 41(3): 194-208.
[4] Litvak N, Vlasiou M. A survey on performance analysis of warehouse carousel systems[J]. Statistica Neerlandica, 2014, 64 (4): 401-447.
[5] Zaerpour N, Yu Y G, de Koster R B M. Response time analysis of a live-cube compact storage system with two storage classes[J]. IISE Transactions, 2017, 49(5): 461-480.
[6] Zaerpour N, Yu Y G, de Koster R B M. Optimal two-class-based storage in a live-cube compact storage system[J]. IISE Transactions, 2017, 49(7): 653-668.
[7] Pazour J A, Meller R D. An analytical model for a-frame system design[J]. IIE Transactions, 2011, 43(10): 739-752.
[8] Reilly P J, Pazour J A, Schneider K R. Propagation of unit location uncertainty in dense storage environments[J]. International Journal of Production Research, 2017, 55(18): 5435-5449.
[9] Boysen N, Briskorn D, Emde S. Sequencing of picking orders in mobile rack warehouses[J]. European Journal of Operational Research, 2017, 259(1): 293-307.
[10] Mirzaei M, De Koster R B M, Zaerpour N. Modelling load retrievals in puzzle-based storage systems[J]. International Journal of Production Research, 2017.1-13.
[11] Kim W R, Kim N, Chang Y S. A study on the control of an automatic picking system(aps)in a warehouse[J]. Assembly Automation, 2016, 36(4): 388-397.
[12] Kota V R, Taylor D, Gue K R. Retrieval time performance in puzzle-based storage systems[J]. Journal of Manufacturing Technology Management, 2015, 26(4): 582-602.
[13] Nastasi G, Colla V, Cateni S. Implementation and comparison of algorithms for multi-objective optimization based on genetic algorithms applied to the management of an automated warehouse[J]. Journal of Intelligent Manufacturing, 2016. 1-13.
[14] Zhao N, Luo L, Lodewijks G. Scheduling two lifts on a common rail considering acceleration and deceleration in a shuttle based storage and retrieval system[J]. Computers & Industrial Engineering, 2018, 124: 48-57.
[15] Imahori S, Hase Y. Graph-based heuristics for operational planning and scheduling problem in automatic picking system[J]. Journal of Advanced Mechanical Design, Systems, and Manufacturing, 2016, 10(3), JAMDSM0039-JAMDSM0039. |