[1] Quirk M, Serda J, Han Zheng-sheng. Semiconductor manufacturing technology[M]. Bejing: Publishing House of Electronics Industry, 2012: 44-82(in chinese). [2] Uzsoy R. Scheduling a single batch processing machine with non-identical job sizes[J]. International Journal of Production Research, 1994, (32): 1615-1635. [3] Kumar S, Kumar P R. Fluctuation smoothing policies are stable for stochastic re-entrant[J]. Discrete Event Dynamic Systems, 1996, 6(2): 361-370. [4] Mason S J, Fowler J W, Carlyle W M. A modified shifting bottleneck heuristic for minimizing total weighted tardiness in complex job shop[J]. Journal of Scheduling, 2002, (5): 247-262. [5] Hwang H, Sun J U. Production sequencing problem with reentrant work flows and sequence dependent set up times[J]. Computers & Industrial Engineering, 1997, 33(5): 773-776. [6] Hochbaum D S, Landy D. Scheduling semiconductor burn-in problem operations to minimize total flow time[J]. Operations Research, 1997, 45: 874-885. [7] Ma Hui-min, YE Chun-ming. Particle swarm optimization algorithm for ba-tch scheduling in semiconductor furnace operation[J]. Computer Integrated Man-ufacturing Systems, 2007,13(6): 1121-1126(in chinese) [8] Guo Cheng-tao. The research on scheduling of wafer fabrication system based on decomposition method and ant colony optimization algorithm[D]. Shanghai:Shanghai Jiao Tong University, 2012(in chinese). [9] Wright T P. Factors affecting the cost of airplanes[J]. Journal of the Aeronautical Sciences, 1936, 3(4): 122-128. [10] Biskup D. Single-machine scheduling with learning considerations[J]. European Journal of Operational Research, 1999, (115): 173-178. [11] Mosheiov G. Scheduling problems with a learning effect[J]. European Journal of Operational Research, 2001, (132): 687-693. [12] Wang J B, Wang M Z, Xia Z Q. Single machine scheduling problems with general learning effect[J]. Journal of Mathematical Research and Exposition, 2005, 25(4): 642-646. [13] Lee W C. A note on deteriorating jobs and learning in single-machine scheduling problems[J]. International Journal of Business and Economics, 2004, (3): 83-89. [14] Wang Gui-na, YU bing-hao, PAN Er-shun. Single-machine group scheduling policy considering learning and forgetting effects[J]. Industrial Engineering and Management, 2012, 17(5): 60-64(in chinese). [15] Chiu H N. Discrete time-varying demand lot-sizing models with learning and forgetting effects[J]. Production Planning and Control, 1997, 8(5): 484-493. [16] Yang Guo-peng. Study on optimization and simulation for semiconductor final testing scheduling with two-staged re-entry[D]. Sichuan: Southwest Jiao Tong University, 2009(in chinese). [17] Dejong J R. The Effects of increasing skills on cycle time and it consequences for time standards[J]. Ergonomics, 1957, 1(1): 51-60. [18] Shi Y, Eberhart R C. Fuzzy adaptive particle swarm optimization[C]. IEEE Int. Conf. on Evolutionary Computation, 2001. 101-106. [19] Tariq A, Ali A. New heuristics for no-wait flowshops to minimize makespan[J]. Computers and Operations Research, 2003, 30(8): 1219-1231. [20] Yang X S. Eagle strategy using levy walk and firefly algorithms for stochastic optimization[J]. Studies in Computational Intelligence, 2010, 2(84): 101-111. [21] Liu Chang-ping, Ye Chun-ming.A discrete firefly algorithm for minimizing the mak-espan in the no-idle permutation flow shops[J]. Journal of Systems and Management, 2014, 5(23): 723-727(in chinese). [22] Cheng Qi-qian. Investment project evaluation[M]. Beijing: China Renmin University Press, 2014. 120-126(in chinese). |