[1] 何正文,任世科,徐渝.基于资金约束的项目支付进度问题研究[J].系统工程学报,2012,27(3):399-406. [2] Shadrokh S, Kianfar F. A genetic algorithm for resource investment projectscheduling problem, tardiness permitted with penalty[J]. European Journal of Operational Research, 2007, 181: 86-101. [3] Naber A, Kolisch R. MIP models for resource-constrained project scheduling with flexible resource profiles[J]. European Journal of Operational Research, 2014, 239: 335-348. [4] Dayanand N, Padman R. Project contracts and payments schedules: the client’s problem[J]. Management Science, 2001, 47 (12): 1654-1667. [5] Dayanand N, PadmanR. A two stage search heuristic for scheduling paymentsin projects[J]. Annals of Operations Research, 2001, 102: 197-220. [6] Ulusoy U, Cebelli S. An equitable approach to the payment scheduling problem in projectmanagement[J]. European Journal of operationalResearch, 2000, 127(2): 262-278. [7] Antonio L, Pilar T, Mariamar C, Federico B. An efficient hybrid genetic algorithm for scheduling projects withresource constraints and multiple execution modes[J]. International Journal Production Economics, 2009, 117: 302-316. [8] Wiesemann W, Kuhn D, Rustem B. Maximizing the net present value of a project under uncertainty[J]. European Journal of Operational Research, 2010, 202: 356-367. [9] Michael J M, Pieter P, Paul M, Lieven Q. A technological contingency perspective on thedepth and scope of international outsourcing[J]. Journal of InternationalManagement, 2004, 10(2): 287-305. [10] Jin F S, Wei T C. Amethod to determine minimum contract bids for incentive highway projects[J]. International Journal of Project Management, 2003(21): 114-122. [11] Abdulaziz A B. Incentive/disincentive contracts and its effects on industrial project[J]. International Journalof project Management, 2003(21): 63-70. [12] He Z, Xu Y. Multi-mode project payment scheduling problems with bonus-penalty structure[J]. European Journal of Operational Research, 2008, 189: 1191-207. [13] Moslem S, Seyed T A N, Amir A N. An efficient genetic algorithm to maximize net present value of project paymentsunder inflation and bonus-penalty policy in resource investment problem e[J]. Advances in Engineering Software, 2010, 41: 1023-1030. [14] Hosseinian S M, Carmichael D G. Optimal incentive contract with risk-neutral contractor[J]. Journal of Construction Engineering and Management, 2013, 139(8): 899-909. [15] Berends T C. Cost plus incentive fee contractingexperiences and structuring[J]. International Journal of Project Management, 2000, (18): 348-362. [16] 陈勇强,傅永程,华冬冬.基于多任务委托代理的业主与承包商激励模型[J].管理科学学报,2016,19(4):45-54. [17] 石晓军,张顺明,Hiroshi T.软件外包的两阶段付款合同设计:考虑双边期权价值的纳什谈判方法与实证[J].管理科学学报,2015,18(7):1-12. [18] Kern T, Willcocks L P, Van H E. The winner’s cures in IT outsourcing: strategies for avoiding relational trauma[J]. California Management Review, 2002, 44(2): 47-69. [19] Dey D, Fan M, Zhang C. Design and analysis of contracts for software outsourcing[J]. Information Systems Research, 2010, 21(1): 93-114. [20] 张宗明,廖貅武,刘树林.需求不确定性下IT服务外包合同设计与分析[J].管理科学学报,2013,16(2):46-59. [21] 任龙,刘骏.考虑下侧风险厌恶参与者的技术外包合同研究[J].中国管理科学,2017,25(4):184-188. [22] 鲁芳,王丹丹,罗定提.客户企业参与下服务外包激励机制设计[J].运筹与管理,2017,48(2):274-282. [23] 宋寒,代应,祝静.风险规避下研发外包中隐性知识共享的关系契约激励[J].系统管理学报,2016,25(3):415-421. [24] 鲁芳,王丹丹,罗定提.关系契约下服务外包专用性资产投资激励机制设计[J].系统工程,2016,34(10):84-90. |