[1] Lam Y. A note on the optimal replacement problem[J]. Advances in Applied Probability, 1988, 20: 479-482.
[2] Lam Y. Geometric process and replacement problem[J]. Acta Mathematicae Applicatae Sinica, 1988, 4: 366-377.
[3] 张晓爽, 孟宪云, 等.基于修理设备的冷贮备可修系统的维修策略[J].运筹与管理, 2011, 20(3):150-155.
[4] Wang G J, Zhang Y L. Geometric process model for a system with inspections and preventive repair[J]. Computers & Industrial Engineering, 2014, 75: 13-19.
[5] Zong S L, Chai G R, Zhang Z G, et al. Optimal replacement policy for a deteriorating system with increasing repair times[J]. Applied Mathematical Modelling, 2013, 37: 9768-9775.
[6] Yu M M, Tang Y H, Liu L P, et al. A phase-type geometric process repair model with spare device procurement and repairmans multiple vacations[J]. European Journal of Operational Research, 2013, 25: 310-323.
[7] 王怡, 岳德权.基于几何过程和位相分布休假的两部件并联可修系统的可靠性分析[J].数学的实践与认识.2017, 47(8):190-199.
[8] 高俏俏, 岳德权.修理设备可修理的几何过程模型的最优维修策略[J].系统工程理论与实践, 2018, 38(4):1043-1051.
[9] Kim M J, Makis V. Optimal maintenance policy for a multi-state deteriorating system with two types of failures under general repair[J]. Computers and Industrial Engineering, 2009, 57: 298-303.
[10] Zequeira R I, Brenguer C. Periodic imperfect preventive maintenance with two categories of competing failure modes[J]. Reliability Engineering and System Safety, 2006, 91: 460-468.
[11] Castro I T. A model of imperfect preventive maintenance with dependent failure modes[J]. European Journal of Operational Research, 2009, 16: 217-224.
[12] Cheng G Q, Li L. An optimal replacement policy for a degenerative system with two-types of failure states[J]. Journal of Computational and Applied Mathematics, 2014, 21: 139-145.
[13] Lin D, Zuo M J, Yam R C M. Sequential imperfect preventive maintenance models with two categories of failure modes[J]. Naval Research Logistics, 2001, 48: 173-183.
[14] Peng R, Liu B, Zhai Q Q, et al. Optimal maintenance strategy for systems with two failure modes[J]. Reliability Engineering and System Safety, 2017, 172: 1-9.
[15] Qiu Q G, Cui L R. Reliability evaluation based on a dependent two-stage failure process with competing failures[J]. Applied Mathematical Modelling, 2018, 64: 699-712.
[16] Fu G Y, Yang W, Li C Q, et al. Reliability analysis of corrosion affected underground steel pipes considering multiple failure modes and their stochastic correlations[J]. Tunnelling and Underground Space Technology, 2019, 87: 56-63.
[17] Delia M G, Ralael P O. Constructing a Markov process for modelling a reliability system under multiple failures and replacements[J]. Reliability Engineering and System Safety, 2018, 173: 34-47.
[18] Shi Z W, Gu C S, Zheng X Q, et al. Multiple failure modes analysis of the dam system by means of line sampling simulation[J]. Optik, 2016, 127: 4710-4715.
[19] Wang G J, Zhang Y L. Optimal repair-replacement policies for a system with two types of Failures[J]. European Journal of Operational Research, 2013, 26: 500-506. |