[1] 韩晓龙.集装箱港口龙门吊的最优路径问题[J].上海海事大学学报,2005,26(2):39-41. [2] 郭文文,计明军,祝慧灵,王清斌.集装箱码头装船顺序和场桥行驶路径联合优化[J].交通运输系统工程与信息,2018,18(4):178-187. [3] 张笑菊,曾庆成,杨忠振.基于堆场混合堆存的集装箱码头装船顺序优化模型[J].系统工程理论与实践,2016,36(9):2374-2382. [4] 周鹏飞,赵金秋.基于预约和图表示的集装箱出口箱位优选[J].控制与决策,2017,32(10):1914-1920. [5] Lee Yusin, Hsu Nai-Yun. An optimization model for the container pre-marshalling problem[J]. Computer and Operations Research, 2007, 34(11): 3295-3313. [6] Zehendner Elisabeth, Feillet Dominique, Jaillet Patrick. An algorithm with performance guarantee for the online container relocation problem[J]. European Journal of Operational Research, 2017, 259(1): 48-62. [7] 郑红星,刘保利,匡海波,闫叙.考虑实时预倒箱的出口箱堆场多场桥调度优化[J].中国管理科学,2018,26(9):85-96. [8] He Junliang, Chang Daofang, Mi Weijian, Yan Wei. A hybrid parallel genetic algorithm for yard crane scheduling[J]. Transportation Research Part E Logistics & Transportation Review, 2010, 46(1): 136-155. [9] 陈超,台伟力,杨逸蓝,曾庆成.出口箱随机入港下的箱区选择与箱位分配协调调度[J].上海交通大学学报,2014,48(4):544-550,557. [10] 周鹏飞,方波.动态环境下集装箱码头堆场出口箱箱位分配建模与算法研究[J].控制与决策,2011,26(10):1571-1576. [11] 邵乾虔,徐奇,边展,靳志宏.考虑了交箱时间不确定性的场桥堆存作业优化[J].系统工程理论与实践,2015,35(2):394-405. [12] 乐美龙,林艳艳,范志强.基于两阶段启发式算法的多场桥作业调度研究[J].武汉理工大学学报,2012,34(1):60-65. [13] 范厚明,姚茜,马梦知.多场桥分区域平衡策划下的集装箱堆场箱位分配问题[J].控制与决策,2016,31(9):1603-1608. [14] Lin Dung-Ying, Chiang Chia-Wei. The storage space allocation problem at a container terminal[J]. Maritime Policy & Management, 2017, 44(6): 685-704. [15] Gharehgozli Amir Hossein, Yu Yugang, Koster de Rene, Udding Jan Tijmen. An exact method for scheduling a yard crane[J]. European Journal of Operational Research, 2014, 235(2): 431-447. [16] Gharehgozli Amir Hossein, Laporte Gilbert, Yu Yugang, Koster de Rene. Scheduling twin yard cranes in a container block[J]. Transportation Science, 2015, 49(3): 686-705. [17] Zheng Feifeng, Man Xiaoyi, Chu Feng, Liu Ming, Chu Chengbin. Two yard crane scheduling with dynamic processing time and interference[J]. IEEE Transactions on Intelligent Transportation Systems, 2018, 19(12): 3775-3784. [18] Zheng Feifeng, Man Xiaoyi, Chu Feng, Liu Ming, Chu Chengbin. A two-stage stochastic programming for single yard crane with uncertain release times of retrieval tasks[J]. International Journal of Production Research, 2019, 57(13): 4132-4147. [19] Li Wen Kai, Wu Yong, Petering Matthew, Goh Mark, Souza De Robert. Discrete time model and algorithms for container yard crane scheduling[J]. European Journal of Operational Research, 2009, 198(1): 165-172. [20] Galle Virgile, Barnhart Cynthia, Jaillet Patrick. Yard crane scheduling for container storage, retrieval, and relocation[J]. European Journal of Operational Research, 2018, 271(1): 288-316. [21] Bish Ebru K, Leong Thin-Yin, Li Chung-Lun, Ng Jonathan W C, Simchi-Levi David. Analysis of a new vehicle scheduling and location problem[J]. Naval Research Logistics, 2001, 48(5): 363-385. [22] Narasimhan Ananthapadmanabhan, Palekar Udatta S. Analysis and algorithms for the transtainer routing problem in container port operations[J]. Transportation Science, 2002, 36(1): 63-78. [23] 何庆,吴意乐,徐同伟.改进遗传模拟退火算法在TSP优化中的应用[J].控制与决策,2018,33(2):219-225. [24] Hottung Andre, Tierney Kevin. A biased random-key genetic algorithm for the container pre-marshalling problem[J]. Computers & Operations Research, 2016, 75(11): 83-102. |