[1] Moons S, Ramaekers K, Caris A, et al. Integrating production scheduling and vehicle routing decisions at the operational decision level: A review and discussion[J]. Computers & Industrial Engineering, 2017, 104: 224-245. [2] 王旭坪,张珺,易彩玉.B2C电子商务环境下订单拣选与配送联合调度优化[J].中国管理科学,2016,24(7):101-109. [3] King R H, Love R R. Coordinating decisions for increased profits[J]. INFORMS Journal on Applied Analytics, 1980, 10(6): 4-19. [4] 李政道,周泓.基于限时送达服务的订单分派与生产运送调度的集成优化[J].计算机集成制造系统,2014,20(7):1643-1653. [5] 冯鑫,郑斐峰,徐寅峰.批加工生产配送二级供应链协同调度[J].系统管理学报,2015,24(2):275-279. [6] SAĞLAM Ü, BANERJEE A. Integrated multiproduct batch production and truck shipment scheduling under different shipping policies[J]. Omega, 2018,74: 70-81. [7] Qiu Y, Qiao J, Pardalos P M. Optimal production, replenishment, delivery, routing and inventory management policies for products with perishable inventory[J]. Omega, 2019, 82: 193-204. [8] Wang J, Yao S, Sheng J, et al. Minimizing total carbon emissions in an integrated machine scheduling and vehicle routing problem[J]. Journal of Cleaner Production, 2019, 229: 1004-1017. [9] Schubert D, Scholz A, Wäscher G. Integrated order picking and vehicle routing with due dates[J]. OR Spectrum, 2018, 40(4): 1109-1139. [10] Ramaekers K, Caris A, Moons S, et al. Using an integrated order picking-vehicle routing problem to study the impact of delivery time windows in e-commerce[J]. European Transport Research Review, 2018, 10(2): 56-67. [11] Moons S, Braekers K, Ramaekers K, et al. The value of integrating order picking and vehicle routing decisions in a B2C e-commerce environment[J]. International Journal of Production Research, 2019, 57(20): 6405-6423. [12] Zhang J, Liu F, Tang J, et al. The online integrated order picking and delivery considering Pickers’ learning effects for an O2O community supermarket[J]. Transportation Research Part E: Logistics and Transportation Review, 2019, 123: 180-199. [13] Kuhn H, Schubert D, Holzapfel A. Integrated order batching and vehicle routing operations in grocery retail-a general adaptive large neighborhood search algorithm[J]. European Journal of Operational Research, 2020,doi:https://doi.org/10.1016/j.ejor.2020.03.075 [14] Armentano V A, Shiguemoto A L, Løkketangen A. Tabu search with path relinking for an integrated production-distribution problem[J]. Computers & Operations Research, 2011, 38(8): 1199-1209. [15] Low C, Chang C, Li R, et al. Coordination of production scheduling and delivery problems with heterogeneous fleet[J]. International Journal of Production Economics, 2014, 153: 139-148. [16] 唐峰,聂劲.平行机上订单半在线排序的LS算法的性能比分析[J].系统工程,2016(6):72-77. [17] Chen Z, Valraktarakis G L. Integrated scheduling of production and distribution operations[J]. Management Science, 2005, 51(4): 614-628. [18] De Koster M B M, Van der Poort E S, Wolters M. Efficient orderbatching methods in warehouses[J]. International Journal of Production Research, 1999, 37(7): 1479-1504. [19] Woeginger K G. The exact LPT-bound for maximizing the minimum completion time[J]. Operations Research Letters, 1992, 11(5): 281-287. |