[1] HABIBIE F, BARZINPOUR F, SADJADI S. Resource-constrained project scheduling problem: Review of past and recent developments[J]. Journal of Project Management, 2018, 3(2): 55-88. [2] HARTMANN S, BRISKORN D. An updated survey of variants and extensions of the resource-constrained project scheduling problem[J]. European Journal of Operational Research, 2022, 297(1): 1-14. [3] FRANCO-DURAN D M, DE LA GARZA J M. Performance of resource-constrained scheduling heuristics[J]. Journal of Construction Engineering and Management, 2020, 146(4): 4020026. [4] 王海鑫,王祖和,温国锋,等.自适应粒子群算法求解资源受限多项目调度问题[J].管理工程学报,2017,31(4):220-225. [5] 刘万琳,张静文,刘婉君.带有资源柔性约束的max-NPV分布式多项目调度问题[J].运筹与管理,2021,30(8):37-43. [6] 苏志雄,魏汉英,张静文,等.基于整数规划强对偶求解一类局域性资源受限项目调度问题[J].中国管理科学,2022,30(11):159-169. [7] ELLOUMI S, LOUKIL T, FORTEMPS P. Reactive heuristics for disrupted multi-mode resource-constrained project scheduling problem[J]. Expert Systems with Applications, 2021, 167: 114132. [8] GHODDOUSI P, ESHTEHARDIAN E, JOOYBANPOUR S, et al. Multi-mode resource-constrained discrete time-cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm[J]. Automation in Construction, 2013, 30: 216-227. [9] 张立辉,王珂珂,柴剑雪,等.LOB中基于工期决定因素分析的资源均衡算法研究[J].运筹与管理,2021,30(1):99-106. [10] GARCIA-NIEVES J D, PONZ-TIENDA J L, SALCEDO-BERNAL A, et al. The multimode resource-constrained project scheduling problem for repetitive activities in construction projects[J]. Computer-Aided Civil and Infrastructure Engineering, 2018, 33(8): 655-671. [11] TANG Y, LIU R, WANG F, et al. Scheduling optimization of linear schedule with constraint programming[J]. Computer-Aided Civil and Infrastructure Engineering, 2018, 33(2): 124-151. [12] ZOU X, WU G C, ZHANG Q. Work continuity constraints in repetitive project scheduling considering soft logic[J]. Engineering, Construction and Architectural Management, 2021, 28(6): 1713-1738. [13] LEU S S, HWANG S T. Optimal repetitive scheduling model with shareable resource constraint[J]. Journal of Construction Engineering and Management, 2001, 127(4): 270-280. [14] BIRUK S, JASKOWSKI P. Scheduling linear construction projects with constraints on resource availability[J]. Archives of Civil Engineering, 2017, 63(1): 3-15. [15] HSIE M, CHANG C J, YANG I T, et al. Resource-constrained scheduling for continuous repetitive projects with time-based production units[J]. Automation in Construction, 2009, 18(7): 942-949. [16] HERAVI G, MORIDI S. Resource-constrained time-cost tradeoff for repetitive construction projects[J]. KSCE Journal of Civil Engineering, 2019, 23(8): 3265-3274. [17] GARCIA-NIEVES J D, PONZ-TIENDA J L, OSPINA-ALVARADO A, et al. Multipurpose linear programming optimization model for repetitive activities scheduling in construction projects[J]. Automation in Construction, 2019, 105: 102799. |