[1] Pinedo M. Scheduling theory, algorithm and systems[M]. Third edition. New York: Springer Science+Business Media, LLC, 2008: 33-57. [2] 唐国春,张峰,罗守成,刘丽丽.现代排序论[M].第一版.上海:上海科学普及出版社,2003.15-36. [3] 陈荣军,唐国春.单机供应链排序及流水作业的反问题模型[J].运筹与管理,2009,18(2):80-84. [4] Li J Q, Mirchandani P B, Borenstein D. Real-time vehicle rerouting problems with time windows[J]. European Journal of Operational Research, 2009, 194(3): 711-727. [5] Lee CY, Yu G. Parallel machine scheduling under potential disruption[J]. Optimization Letters, 2008, 2(1): 27-37. [6] Yu G, Arguello M, Song G, et al. A new era for crew recovery at continental airlines[J]. Interfaces, 2003, 33(1): 5-22. [7] 于辉,陈剑,于刚.回购契约下供应链对突发事件的协调对应[J].系统工程理论与实践,2005,25(8):38-43. [8] Qi X T, Bard J F, Yu G. Supply chain coordination with demand disruption[J]. Omega, 2004, 32(4): 301-312. [9] 胡祥培,丁秋雷,张漪,王旭坪.干扰管理研究评述[J].管理科学,2007,20(2):2-8. [10] 胡祥培,张漪,丁秋雷,王旭坪.干扰管理模型及其算法的研究进展[J].系统工程理论与实践,2008,28(10):40-46. [11] Mansouri S A, Hendizadeh S H, Salmasi N. Bi-criteria scheduling of a two-machine flowshop with sequence-dependent setup times[J]. International Journal of Advanced Manufacturing Technology, 2009, 40(11-12): 1216-226. [12] Qi X T, Bard J F, Yu G. Disruption management for machine scheduling: the case of SPT schedules[J]. International Journal of Production Economics, 2006, 103(1): 166-184. [13] 唐焕文,秦学志.实用最优化方法[M].第三版.大连:大连理工大学出版社,2004:236-256. |