[1] Franco B C, Celano G, Castagliola P, et al. Economic design of shewhart control charts for monitoring autocorrelated data with skip sampling strategies[J]. International Journal of Production Economics, 2014, 151(5): 121-130. [2] Woodall W H, Montgomery D C. Some current directions in the theory and application of statistical process monitoring[J]. Journal of Quality Technology, 2014, 46(1): 78-94. [3] Kim J, Jeong M, Elsayed E. Monitoring multistage processes with autocorrelated observations[J]. International Journal of Production Research, 2017, 55(8): 2385-2396. [4] He Z, Wang Z, Tsung F, et al. A control scheme for autocorrelatedbivariate binomial data[J]. Computers & Industrial Engineering, 2016, 98(8): 350-359. [5] Capizzi G, Masarotto G. Bootstrap-based design of residual control charts[J]. IIE Transactions, 2009, 41(4): 275-286. [6] Qiu P, Zhang J. On phase II SPC in cases when normality is invalid[J]. Quality and Reliability Engineering International, 2015, 31(1): 27-35. [7] Hwarng H B. Detecting process mean shift in the presence of autocorrelation: a neural network based monitoring scheme[J]. International Journal of Production Research, 2004, 42(3): 573-595. [8] Hwarng H B. Simultaneous detection of mean shift and correlation change in AR(1)processes[J]. International Journal of Production Research, 2005,43 (9): 1761-1783. [9] Jiang W, Tsui K, Woodall W. A new SPC monitoring method: the ARMA chart[J]. Technometrics,2000, 42(4): 399-410. [10] Jiang W. Average run length computation of ARMA charts for stationary processes[J]. Communications in Statistics-Simulation and Computation, 2001, 30(3): 699-716. [11] Lin S N, Chou C Y, Wang S L, Liu H R. Economic design of autoregressive moving average control chart using genetic algorithms[J]. Expert Systems with Applications, 2012, 39(2): 1793-1798. [12] Costa A, Fichera S. Economic statistical design of ARMA control chart through a modified fitness-based self-adaptive differential evolution[J]. Computers & Industrial Engineering, 2017, 105(3): 174-189. [13] Lucas J M, Saccucci M S. Exponentially weighted moving average control schemes: properties and enhancements[J]. Technometrics, 1990, 32(1): 1-12. [14] Lorenzen T J, Vance L C. The economic design of control charts: a unified approach[J]. Technometrics,1986, 28(1): 3-10. |