[1] Sahin I, Polatoglu H. Quality, warranty and preventive maintenance[M]. New York: Springer Science & Business Media, 2012. [2] 董克,吕文元.基于历史故障数据的租赁设备预防维护策略优化[J].运筹与管理,2018,26(5):119-124. [3] 张晓爽,孟宪云,贾鹏茹,等.基于修理设备的冷贮备可修系统的维修策略[J].运筹与管理,2011(3):150-155. [4] Murthy D N P, Djamaludin I. New product warranty: a literature review[J]. International Journal of Production Economics, 2002, 79(3): 231-260. [5] Rai B, Singh N. Modeling and analysis of automobile warranty data in presence of bias due to customer-rush near warranty expiration limit[J]. Reliability Engineering & System Safety, 2004, 86(1): 83-94. [6] Oh Y S, Bai D S. Field data analyses with additional after-warranty failure data[J]. Reliability Engineering & System Safety, 2001, 72(1): 1-8. [7] Jung M, Bai D S. Analysis of field data under two-dimensional warranty[J]. Reliability Engineering & System Safety, 2007, 92(2): 135-143. [8] Wu C C, Chou C Y, Huang C. Optimal burn-in time and warranty length under fully renewing combination free replacement and pro-rata warranty[J]. Reliability Engineering & System Safety, 2007, 92(7): 914-920. [9] Chien Y H. A new warranty strategy: combining a renewing free-replacement warranty with a rebate policy[J]. Quality and Reliability Engineering International, 2008, 24(7): 807-815. [10] Chien Y H. Optimal age for preventive replacement under a combined fully renewable free replacement with a pro-rata warranty[J]. International Journal of Production Economics, 2010, 124(1): 198-205. [11] 贾云献,李欣癑,王鹏,等.考虑多故障模式的新型装备更新保修费用预测[J].系统工程与电子技术,2015,37(8):1810-1817. [12] Lam Y, Lam P K W. An extended warranty policy with options open to consumers[J]. European Journal of Operational Research, 2001, 131(3): 514-529. [13] Wu S, Longhurst P. Optimising age-replacement and extended non-renewing warranty policies in lifecycle costing[J]. International Journal of Production Economics, 2011, 130(2): 262-267. [14] Bouguerra S, Chelbi A, Rezg N. A decision model for adopting an extended warranty under different maintenance policies[J]. International Journal of Production Economics, 2012, 135(2): 840-849. [15] Jung K M, Park M, Park D H. Cost optimization model following extended renewing two-phase warranty[J]. Computers & Industrial Engineering, 2015, 79: 188-194. [16] Park M, Jung K M, Park D H. Optimal maintenance strategy under renewable warranty with repair time threshold[J]. Applied Mathematical Modelling, 2017, 43: 498-508. [17] Wang L, Pei Z, Zhu H, et al. Optimising extended warranty policies following the two-dimensional warrantywith repair time threshold[J]. Eksploatacjai Niezawodnosc-Maintenance and Reliability, 2018, 20(4): 523-530. [18] Park M, Jung K M, Park D H. Optimization of periodic preventive maintenance policy following the expiration of two-dimensional warranty[J]. Reliability Engineering & System Safety, 2018, 170: 1-9. [19] Shang L, Si S, Cai Z. Optimal maintenance-replacement policy of products with competing failures after expiry of the warranty[J]. Computers & Industrial Engineering, 2016, 98: 68-77. [20] Su C, Wang X. A two-stage preventive maintenance optimization model incorporating two-dimensional extended warranty[J]. Reliability Engineering & System Safety, 2016, 155: 169-178. [21] Yang D, He Z, He S. Warranty claims forecasting based on a general imperfect repair model considering usage rate[J]. Reliability Engineering & System Safety, 2016, 145: 147-154. [22] Wang J, Zhou Z, Peng H. Flexible decision models for a two-dimensional warranty policy with periodic preventive maintenance[J]. Reliability Engineering & System Safety, 2017, 162: 14-27. [23] Shafiee M, Chukova S. Maintenance models in warranty: a literature review[J]. European Journal of Operational Research, 2013, 229(3): 561-572. [24] Chattopadhyay G N, Murthy D N P. Warranty cost analysis for second-hand products[J]. Mathematical and Computer Modelling, 2000, 31(10): 81-88. [25] Pongpech J, Murthy D N P, Boondiskulchock R. Maintenance strategies for used equipment under lease[J]. Journal of Quality in Maintenance Engineering, 2006, 12(1): 52-67. [26] Shafiee M, Finkelstein M, Chukova S. On optimal upgrade level for used products under given cost structures[J]. Reliability Engineering & System Safety, 2011, 96(2): 286-291. [27] Barlow R E, Proschan F. Mathematical theory of reliability[M]. Siam, 1996. [28] Chattopadhyay G, Murthy D N P. Cost sharing warranty policies for second-hand products[J]. International Transactions in Operational Research, 2001, 8(1): 47-60. [29] Chattopadhyay G, Rahman A. Development of lifetime warranty policies and models for estimating costs[J]. Reliability Engineering & System Safety, 2008, 93(4): 522-529. [30] Shafiee M, Chukova S. Optimal upgrade strategy, warranty policy and sale price for second-and products[J]. Applied Stochastic Models in Business and Industry, 2013, 29(2): 157-169. |