基于工期-成本综合效用最大的关键链项目缓冲确定
张俊光, 刘念
Buffer Determination of Critical Chain Project Based on the Two-objective Optimization of Project Duration and Cost
ZHANG Jun-guang, LIU Nian
运筹与管理 . 2021, (10): 87 -94 .  DOI: 10.12005/orms.2021.0318