[1] 王益锋,仲毅.基于粒子群算法的企业项目群进度优化模型研究[J].软科学,2014,(6):16-20. [2] 丰景春,胡正人,任亚芳,等.项目群视角下大中型工程合同项目工期奖励模型[J].系统工程理论与实践,2012,(6):1369-1376. [3] Tommy Y, Lo I W H F. Construction delays in hong kong civil engineering projects[J]. Journal of Construction Engineering and Management, 2006, 132(6): 636-649. [4] Miehael R, Finke P E. Window analyses of compensable delays[J]. Journal of Construction Engineering and Management, 1999, 125(2): 96-100. [5] Zheng-wen H E, Xu Yu, Zhu Shao-ying. Study on project payment scheduling problems with bonus-penalty structure from two viewpoints[J]. Systems Engineering-theory & Practice, 2005, (10): 39-45. [6] 何正文,徐渝.多模式项目支付进度的整合优化研究[J].系统工程理论与实践,2006,(1):76-83. [7] 柴国荣,徐渝,张静文,等.多模式柔性资源约束型折现流项目进度问题研究[J].系统工程,2005,(2):14-18. [8] 吕胜普,李建设,杨飞雪.多事件交叉干扰下的工期索赔方法[J].土木工程学报,2005,(11):112-116. [9] 杨德钦.多事件干扰下工期延误索赔原则研究[J].土木工程学报,2003,(3):37-40. [10] 汪应洛,杨耀红.多合同的激励优化与最优工期的确定[J].预测,2005,(2):60-63. [11] Tareghian H R, Taheri H. An application of randomized minimum cut to the project time/cost trade-off problem[J]. Applied mathematics and Computation, 2006, 173(2): 1200-1207. [12] Bubshait A. Incentive/disincentive contracts and its effects on industrial projects[J]. International Journal of Project Management, 2003, 21(1): 63-70. [13] Sivathanu Pillai A. Performance measurement of R&D projects in multi-projects concurrent engineering environment[J]. International Journal of Project Management, 2002, (20): 165-170. [14] Jing-Chun Feng, Yafang Ren and others. Penalty model for delay of bidding section construction period in south-to-north water diversion eastern route project from perspective of programs[J]. Water Science and Engineering, 2012, 5(3): 350-360. [15] 王卓甫,洪伟民.基于Shapley值的工期延误分析[J].公路,2007,(5):121-124. [16] 郭汉丁,郑丕谔,郝海.工期索赔分析中网络计算的叠加和发散效应[J].西安建筑科技大学学报(自然科学版),2003,35(01):59-62. [17] 丰景春,张云华.基于不确定性扰动的大中型工程项目群柔性进度计划模型[J].水力发电学报,2014,(2):273-280. [18] 乞建勋,李星梅,王强,等.效子网络构建的理论与方法[J].管理科学学报,2010,(1):40-44. |