Penalty Model for Delay of Construction Period Based on theSub-networks from the Perspective of Programs

WANG Yu-ting1,2, ZHANG Ke1,4, FENG Jing-chun1,3, XUE Song1,2, CUI Jing-hao1   

  1. 1.Business School, Hohai University, Nanjing 211100, China;
    2.Institute of Project Management of Hohai University, Nanjing 211100, China;
    3.Jiangsu Provincial Collaborative Innovation Center of World Water Valley and Water ecological civilization, Nanjing 211100, China;
    4.International River Research Center of Hohai University, Nanjing 211100, China
  • Received:2015-07-08 Online:2017-06-25

基于子网络的项目群工期延误惩罚模型研究

汪玉亭1, 2, 张可1, 4, 丰景春1, 3, 薛松1, 2, 崔敬浩1   

  1. 1.河海大学 商学院,江苏 南京 211100;
    2.河海大学 项目管理研究所,江苏 南京 211100;
    3.江苏省“世界水谷”与水生态文明协同创新中心,江苏 南京 211100;
    4.河海大学 国际河流研究中心,江苏 南京 211100
  • 作者简介:汪玉亭(1993-),女,安徽舒城人,博士研究生,研究方向:工程管理与项目管理。
  • 基金资助:
    基础设施领域财政支持公私合作伙伴(PPP)机制创新,2014年度国家社科基金重点项目(14AZD024);中国博士后基金:重大水利工程项目组织协同演化及治理机制研究,中国博士后科学基金(2014M551498);十二五科技支撑计划(2015BAB07B01);大型基础设施财政支持公私合作伙伴(PPP)项目决策机制研究,中央高校基本科研业务费专项资金资助(2014B09014);教育部创新团队(IRT13062);国际河流战略与情报监测研究,2014年;市场决定性作用下PPP项目协同监管模式研究,国家社科基金青年项目(15CJL023)

Abstract: For the existing penalty model for delay of construction period of programs there has been less study on delay of construction period that results in partial and overall effect. This paper introduces sub-networks to constructing the programs based on the sub-networks. On the basis of the present situation of calculation of penalty for delay of the construction period with the critical path method, we study the effects of contractor-induced delay of construction period of between-sub-networks and internal-sub-network respectively, and then construct a penalty model for delay of the construction period based on sub-networks from the perspective of programs. Using the penalty model, we make a practical analysis of penalty for delay of the construction period of the program Z.

Key words: program, sub-networks, delay of construction period, critical path method(CPM), penalty model

摘要: 针对现有项目群工期延误惩罚模型较少研究工期延误产生的局部与整体效应,通过引入项目群的子网络,构建了基于子网络的项目群结构。在此基础上,采用关键路径方法(CPM),分别研究了因承包人原因导致的子网络之间和子网络内项目工期延误对项目群所带来的影响,并构建了基于子网络的项目群工期延误惩罚模型。结合Z项目群,对子网络之间和子网络内的工期延误惩罚模型进行了实例分析。

关键词: 项目群, 子网络, 工期延误, 关键路径法(CPM), 惩罚模型