Optimization Methods for Multi-phase Equipment Maintenance Material Supply Considering Lateral Transshipment
ZHANG Chuang1, CAO Junhai2, LI Yantong3, GUO Yiming2
1. School of Equipment Management and Support, Engineering University of PAP, Xi’an 710086, China; 2. Department of Equipment Support and Remanufacturing, Army Academy of Armored Forces, Beijing 100072, China; 3. School of Maritime Economics and Management, Dalian Maritime University, Dalian 116026, China
ZHANG Chuang, CAO Junhai, LI Yantong, GUO Yiming. Optimization Methods for Multi-phase Equipment Maintenance Material Supply Considering Lateral Transshipment[J]. Operations Research and Management Science, 2024, 33(3): 1-7.
[1]ZHANG Y, QI M Y, MIAO L X, et al. Hybrid metaheuristic solutions to inventory location routing problem[J]. Transportation Research Part E: Logistics and Transportation Review, 2014, 70: 305-323. [2]LIU A J, ZHU Q Y, XU L, et al. Sustainable supply chain management for perishable products in emerging markets: An integrated location-inventory-routing model[J]. Transportation Research Part E: Logistics and Transportation Review, 2021, 15: 102319. [3]王梦梦,韩晓龙.考虑碳排放的易腐品供应链选址-路径-库存联合优化[J].上海海事大学学报,2019,40(4):45-51. [4]WU W T, ZHOU W, LIN Y, et al. A hybrid metaheuristic algorithm for location inventory routing problem with time windows and fuel consumption[J]. Expert Systems with Applications, 2021, 166: 114034. [5]尉迟群丽,何正文,王能民.考虑缺货的闭环供应链选址-库存-路径集成优化[J].运筹与管理,2021,30(2):53-60. [6]张光宇,李庆民,郭璇.基于横向转运策略的可修备件多点库存建模方法[J].系统工程与电子技术,2012,34(7):1424-1429. [7]阮旻智,刘任洋.随机需求下多层级备件的横向转运配置优化模型[J].系统工程理论与实践,2016,36(10):2689-2698. [8]陈玉昆,高崎.考虑横向供应的多层次多等级装备维修器材库存控制研究[J].军事运筹与系统工程,2018,32(2):60-65. [9]王超峰,帅斌.带有横向调度的维修备件选址库存路径问题研究[J].计算机工程与应用,2013,49(14):10-14. [10]LI K P, CHEN B, SIVAKUMAR A I, et al. An inventory-routing problem with the objective of travel time minimization[J]. European Journal of Operational Research, 2014, 236(3): 936-945. [11]CAO J X, ZHANG Z X, ZHOU Y G. A location-routing problem for biomass supply chains[J]. Computers & Industrial Engineering, 2021, 152: 107017. [12]NADERI B, ROSHANAEI V, BEGEN M A, et al. Increased surgical capacity without additional resources: Generalized operating room planning and scheduling[J]. Production and Operations Management, 2021, 30(8): 2608-2635. [13]ROSHANAEI V, BOOTH K, ALEMAN D M, et al. Branch-and-check methods for multi-level operating room planning and scheduling[J]. International Journal of Production Economics, 2020, 220: 107433. [14]NADERI B, GOVINDAN K, SOLEIMANI H. A Benders decomposition approach for a real case supply chain network design with capacity acquisition and transporter planning: Wheat distribution network[J]. Annals of Operations Research, 2020, 291: 685-705. [15]FACHINI R F, ARMENTANO V A. Logic-based Benders decomposition for the heterogeneous fixed fleet vehicle routing problem with time windows[J]. Computers & Industrial Engineering, 2020, 48: 106641.