XUAN Hua, GENG Zhuxin, LI Bing. Dynamic Flexible Flowshop Scheduling with Mixed Storage Constraints[J]. Operations Research and Management Science, 2025, 34(3): 105-112.
[1] 郑忠,王永周,卢义,等.考虑铸轧协调的炼钢-连铸-热轧一体化生产计划[J].钢铁,2020,55(12): 107-113. [2] 袁庆欣,董绍华.带有限缓冲区的混合流水车间多目标调度[J].工程科学学报,2021,43(11): 1491-1498. [3] ZHENG Q Q, ZHANG Y, TIAN H W, et al. An effective hybrid meta-heuristic for flexible flow shop scheduling with limited buffers and step-deteriorating jobs[J]. Engineering Applications of Artificial Intelligence, 2021, 106: 104503. [4] WANG S, WANG X, YU L. Two-stage no-wait hybrid flow-shop scheduling with sequence-dependent setup times[J]. International Journal of Systems Science: Operations & Logistics, 2020, 7(3): 291-307. [5] RAHMANIDOUST M, ZHENG J G, RABIEE M. An effectiveharmony search algorithm for solving a no-wait hybrid flow shop scheduling problem with machine availability constraint[J]. Industrial Engineering & Management, 2017, 6(3): 1000225. [6] CHENG C Y, YING K C, LI S F, et al. Minimizing makespan in mixed no-wait flowshops with sequence-dependent setup times[J]. Computers & Industrial Engineering, 2019, 130: 338-347. [7] ZHUANG Z, ZHANG Z, TENG H, et al. Optimization for integrated scheduling of intelligent handling equipment with bidirectional flows and limited buffers at automated container terminals[J]. Computers & Operations Research, 2022, 145: 105863. [8] 轩华,付鑫博,李冰.基于混合离散人工蜂群算法的混合零等待柔性流水车间优化研究[J].工业工程与管理,2023,28(1): 170-180. [9] 轩华,李冰,罗书敏,等.基于总加权完成时间的可重入混合流水车间调度问题[J].控制与决策,2018,33(12): 2218-2226. [10] 王凌,潘子肖.基于深度强化学习与迭代贪婪的流水车间调度优化[J].控制与决策,2021,36(11): 2609-2617. [11] 轩华,郑倩倩,李冰.带不相关并行机和有限缓冲MHFS调度的混合启发式算法[J].控制与决策,2021,36(3): 565-576. [12] 王凌,周刚,许烨,等.求解不相关并行机混合流水线调度问题的人工蜂群算法[J].控制理论与应用,2012,29(12): 1551-1557.