[1] 胡雪君,崔南方,赵雁.基于活动工期风险和资源约束风险的缓冲大小计算方法[J].控制与决策,2016,31(8): 1513-1518. [2] GOLDRATT E M. Critical Chain[M]. Great Barrington: North River Press, 1997. [3] LEACH L P. Critical Chain Project Management[M]. London: Artech House, 2014. [4] 别黎,崔南方.关键链动态缓冲监控方法研究[J].中国管理科学,2010,18(6): 97-103. [5] CHEN Z, DEMEULEMEESTER E, BAI S, et al. A Bayesian approach to set the tolerance limits for a statistical project control method[J]. International Journal of Production Research, 2020, 58(10): 3150-3163. [6] FARIA J, ARAUJO M, DEMEULEMEESTER E, et al. Project management under uncertainty: Using flexible resource management to exploit schedule flexibility[J]. European Journal of Industrial Engineering, 2020, 14(5): 599631. [7] 胡雪君,王建江,崔南方.基于统计过程控制的两阶段缓冲监控方法[J].控制与决策,2020,35(6): 1453-1462. [8] MARTENS A, VANHOUCKE M. A buffer control method for top-down project control[J]. European Journal of Operational Research, 2017, 262(1): 274-286. [9] GHODDOUSI P, ANSARI R, MAKUI A, et al. A risk-oriented buffer allocation model based on critical chain project management[J]. Ksce Journal of Civil Engineering, 2017, 21(5): 1536-1548. [10] 张俊光,万丹.基于缓冲账户差异配置的关键链项目动态集成监控[J].管理评论,2023,35(1): 233-242. [11] HU X J, CUI N F, DEMEULEMEESTER E, et al. Incorporation of activity sensitivity measures into buffer management to manage project schedule risk[J]. European Journal of Operational Research, 2016, 249(2): 717-727. [12] ZHANG J G, WAN D. Integrated buffer monitoring and control based on grey neural network[J]. Journal of the Operational Research Society, 2019, 70(3): 516-529. [13] ZHANG L, XUE H B, LI Z Y, et al. Robust stability analysis of switched grey neural network models with distributed delays over C[J]. Grey Systems: Theory and Application, 2022, 12(4): 879896. [14] YI J Q, WANG Q, ZHAO D B, et al. BP neural network prediction-based variable-period sampling approach for networked control systems[J]. Applied Mathematics and Computation, 2007, 185(2): 976-988. [15] JALOTE P, Software Project Management in Practice[M]. Boston: Addison-Wesley Professional, 2002. [16] 张俊光,万丹.基于系统双重风险共担的多项目鼓缓冲设置研究[J].运筹与管理,2021,30(2): 218-224. |