NIU Lixia, WEI Yisong, YU Qian. Multi-objective Optimization of Chip Production Scheduling inPhotolithography Area under Different Resource Constraints[J]. Operations Research and Management Science, 2026, 35(2): 128-134.
[1] 裴小兵,祁文博,戴毓彤.求解柔性作业车间调度问题的新型改进Jaya算法[J].计算机工程与应用,2022,58(19):318-325. [2] 张朝阳,徐莉萍,李健,等.基于改进狼群算法的柔性作业车间调度研究[J].系统仿真学报,2022,45(3):165-170. [3] 熊福力,储梦伶.预制构件流水车间订单接受与调度的集成优化[J].运筹与管理,2022,31(8):70-76+84. [4] 黄辉,李梦想,严永.考虑序列设置时间的混合流水车间多目标调度研究[J].运筹与管理,2020,29(12):215-221. [5] XIA B, TIAN T, GAO Y, et al. A dynamic dispatching method for large-scale Interbay material handling systems of semiconductor FAB[J]. Sustainability, 2022, 14(21): (Article)13882. [6] HAN J H, LEE J Y. Scheduling for a flow shop with waiting time constraints and missing operations in semiconductor manufacturing[J]. Engineering Optimization, 2023, 55 (10): 1742-1759. [7] LIU J, QIAO F, ZOU M, et al. Dynamic scheduling for semiconductor manufacturing systems with uncertainties using convolutional neural networks and reinforcement learning[J]. Complex & Intelligent Systems, 2022, 8(6): 4641-4662. [8] 杨雯惠,陈璐,张昕莹.考虑设备时变效应的晶圆加工序列决策调度方法[J].哈尔滨工业大学学报,2022,54(7):29-36. [9] BASTOS C E N, RESENDO L C. Two-step approach for scheduling jobs to non-related parallel machines with sequence dependent setup times applying job splitting[J]. Computers & Industrial Engineering, 2020, 145: 106500. [10] ZHANG P, ZHAO X, SHENG X, et al. An imperialist competitive algorithm incorporating remaining cycle time prediction for photolithography machines scheduling[J]. IEEE Access, 2018, 6: 66787-66797. [11] CHEN H C, GUO P, JIMENEZ J, et al. Unrelated parallel machine photolithography scheduling problem with dual resource constraints[J]. IEEE Transactions on Semiconductor Manufacturing, 2023, 36(1): 100-112. [12] 欧阳城添,刘裕嘉,朱东林.融合精英学习与多项式变异的改进麻雀算法[J].计算机仿真,2023,40(5):398-403+547. [13] 蒋开正,吕丽平.自适应变异麻雀算法优化LSTM变速箱故障诊断[J].噪声与振动控制,2023,43(4):129-134.