[1] Biskup D. Single-machine scheduling with learning consideration[J]. European Journal of Operational Research, 1999, 115: 173-178. [2] Mosheiov G. Scheduling problems with learning effect[J]. European Journal of Operational Research, 2001, 132: 687-693. [3] Kuo W H, Yang D L. Minimizing the total completion time on a single-machine scheduling problem with a time-dependent learning effect[J]. European Journal of Operational Research, 2006, 97: 64-67. [4] Cheng M B, Sun S J. The single machine scheduling problems with deteriorating jobs and learning effect[J]. Zhe Jiang University A, 2006, 7(4): 597-601. [5] Huang X, Wang J B, Wang L Y, Gao W J, Wang X R. Single machine scheduling with time-dependent deterioration and exponential learning effect[J]. Computers & Industry Engineering, 2010, 58: 58-63. [6] Cheng M B, Pandu R, Tadikamalla, Jennifer Shang, Zhang B X. Single machine scheduling problems with exponentially time-dependent learning effects[J]. Journal of Manufacturing Systems, 2015, 34: 60-65. [7] Alidaee B, Ahmadian A. Two parallel machine sequencing problems involving controllable times[J]. European Journal of Operational Research, 1993, 70: 335-341. [8] Shabtay D, Kaspi M. Minimizing the total weighted flow time in a single machine with controllable processing times[J]. Computers and Operation Research, 2004, 31: 2279-2289. [9] Wei C M, Wang J B, Ji P. Single-machine scheduling with time-and-resoource-dependent processing times[J]. Applied Mathematical Modeling, 2012, 36: 792-798. [10] Wang D, Wang M Z, Wang J B. Single-machine scheduling with learning effect and resource-dependent processing times[J]. Computers & Industry Engineering, 2010, 59: 458-462. [11] Lu Y Y, Li G, Wu Y B, Ji P. Optimal due date assignment problem with learning effect and resource-dependent processing times[J]. Optimization Letters, 2014, 8: 113-127. [12] Panwalker S S, Smith M L, Seidmann A. Common due-date assignment to minimize total penalty for the one machine scheduling problem[J]. Operations Research, 1982, 30: 391-399. [13] Adamopoulos G I, Pappis C P. Single machine scheduling with flow allowance[J]. Journal of Operational Research Society, 1996, 47: 1280-1285. |