[1] 施建刚,吴光东,唐代中.基于知识流的项目导向型供应链跨组织合作激励机制[J].软科学,2011,25(4):44-49.
[2] 何正文,徐渝,朱少英.具有奖励惩罚结构的项目支付进度问题研究: 双重角度[J].系统工程理论与实践,2005,(10):39-45.
[3] Mol M J, Pauwels P, Matthyssens P L. A technological contingency perspective on the depth and scope of international outsourcing[J]. Journal of International Management, 2004, 10(2): 287-305
[4] 苏菊宁,蒋昌盛,刘晨光,陈菊红.基于奖惩机制的建筑供应链工期协调优化研究[J].中国管理科学,2010,18(1):95-101.
[5] 柴国荣,洪兆富,何正文.柔性资源约束下的大型项目奖惩结构优化[J].系统管理学报,2009,18(2):142-146.
[6] 何正文,徐渝.工程项目支付进度优化:一个案例研究[J].管理工程学报,2008,22(1):67-71.
[7] Konstantin K, Avraham S. Scheduling projects with variable-intensity activities: the case of dynamic earliness and tardiness costs[J]. European Journal of Operational Research, 1999, 118(1): 65-80.
[8] Ibarhim M, Ammar K. Modelling payment mechanisms for supply chain in construction[J]. Engineering, Construction and Architectural Management, 2009, 16(4): 325-336.
[9] Matthews J, Pellew L, Phua F. Quality relationships: partnering in the construction supply Chain[J]. International Journal of Quality & Reliability Management, 2003, 17(5): 493-510.
[10] Ramy E, Arieh G. A multi-period game theoretic model of venture capitalists and entreprenesurs[J]. European Journal of Operational Research, 2003, 144(3): 440-453.
[11] 张矢的,魏东旭.风险投资中双重道德风险的多阶段博弈分析[J].南开经济研究,2008,(6):143-150.
[12] Khalid K, Marton M, Steven D. Managing subcontractor supply chain for quality in construction[J]. Engineering, Construction and Architectural Management, 2006, 13(1): 27-42.
[13] Parrod N, Thierry C, Fanrgier H. Cooperative subcontracting relationship within a project supply chain: a simulation approach[J]. Simulation Modelling Practice and Theory, 2007, 15(1): 137-152.
[14] 程妤,尤建新.工程项目供应链合作绩效系统的定性模拟研究[J].土木工程学报,2006,39(2):113-116.
[15] Berends T C. Cost plus incentive fee contracting——experiences and structuring[J]. International Journal of Project Management, 2000, 18(9): 165-171.
[16] 柴国荣,洪兆富,亓文国.基于进度优化的大型项目激励机制模型[J].系统工程,2008,26(1):102-105.
[17] Abdulaziz B A. Incentive/disincentive contracts and its effects on industrial projects[J]. International Journal of Project Management, 2003, 21(3): 63-70.
[18] Chen H L. An empirical examination of project contractors' supply-chain cash flow performance and owners' payment patterns[J]. International Journal of Project Management, 2010, 4(1): 1-11.
[19] 杨青,李钰.风险投资中的双重道德风险与最优合约安排分析[J].系统工程,2004,22(11):71-73. |