[1] Chung Y G, Randhawa S U, McDowell E D. A simulation analysis for a transtainer-based container handling facility[J]. Computers & Industrial Engineering, 1988, 14(2): 113-125. [2] Kim K Y, Kim K H. A routing algorithm for a single transfer crane to load export containers onto a containership [J]. Computers & Industrial Engineering, 1997, 33(3-4): 673-676. [3] Kim K H, Kim K Y. An optimal routing algorithm for a transfer crane in port container terminals[J]. Transportation Science, 1999, 33(1): 17-33. [4] Kim K Y, Kim K H. Heuristic algorithm for routing yard-side equipment for minimizing loading times in container terminals[J]. Naval Research Logistics, 2003, 50(5): 498-514. [5] Narasimhan A, Palekar U S. Analysis and algorithms for the transtainer routing problem in container port operations[J]. Transportation Science, 2002, 36(1): 63-78. [6] Kim K H, Lee K M, Hwang H. Sequencing delivery and receiving operation for yard cranes in port container terminals[J]. International Journal of Production Economics, 2003, 84(3): 283-292. [7] Kim K H, Young-Man P. A Crane Scheduling Method for port container terminals[J]. European Journal of Operational Research, Part E, 2004, 156(3): 752-768. [8] Ng W C, Mark K L. Yard crane scheduling in port container terminals[J]. Applied Mathematical Modeling, 2005, 29(3): 263-267. [9] Ng W C, Mark K L. An effective heuristic for scheduling a yard crane to handle jobs with different ready times[J]. Engineering Optimization, 2005, 37(8): 867-877. [10] 韩晓龙.集装箱港口轨道式龙门吊的最优路径问题[J].上海海事大学学报,2005,26(2):39-41. [11] 何军良,宓为建,严伟.基于爬山算法的集装箱堆场场桥调度[J].上海海事大学学报,2007,28(4):11-15. [12] Zhang C, Wan Y W, Liu J Y, Linn R J. Dynamic crane deployment in container storage yards[J]. Transportation Research, Part B, 2002, 36(6): 537-555. [13] Ng W C. Crane scheduling in container yards with inter-crane interference[J]. European Journal of Operational Research, 2005, 164(1): 64-78. [14] Lee D H, Cao Z, Meng Q. Scheduling of two-transtainer systems for loading operation of containers using revised genetic algorithm[C]. In: TRB 85th Annual Meeting Compendium of Papers CD-ROM, Washington DC, 2006. [15] Lee D H, Cao Z, Meng Q. Scheduling of two-transtainer systems for loading ooutbound containers in port container terminals with simulated annealing algorithm[J]. International Journal of Production Economics, 2007, 107(1): 115-124. [16] 魏众,申金升,肖荣娜,张智文,石定寰.港口集装箱码头轮胎式轨道式龙门吊优化调度研究[J].中国工程科学,2007,9(8):22-24. [17] 韩晓龙,丁以中.集装箱港口轨道式龙门吊配置优化研究[J].中国航海,2008,31(1):6-8,14. |