[1] Heyman D P. T-policy for the M/G/1 queue[J]. Management Science, 1977, 23(7): 775-778.
[2] Zhu Y J, Pan X C, Hu B. Geom/Geom/1 queue with working vacations and N-policy and set-up time[J]. Communication on Applied Mathematics & Computation, 2010, 24(1): 25-34.
[3] 唐应辉,蒲会,余玅妙.带启动时间的N-策略M/G/1排队系统的队长[J].系统工程理论与实践,2011,31(1):131-137.
[4] Lan S J, Tang Y H. Analysis of D-policy discrete-time Geo/G/1 queue with second J-optional service and unreliable server[J]. RAIRO-Operations Research, 2017, 51(1): 101-122.
[5] 唐应辉,吴文青,刘云颇.基于多重休假的Min(N,V)-策略M/G/1排队系统的队长分布[J].系统工程理论与实践,2014,34(6):1533-1546.
[6] 魏瑛源,唐应辉,余玅妙.基于Min(N,D)-策略的M/G/1排队系统的队长分布及最优策略[J].系统科学与数学,2015,35(6):729-744.
[7] Gu J X, Wei Y Y, Tang Y H, et al. Queue size distribution of Geo/G/1 queue under the Min(N,D)-policy[J]. Journal of Systems Science and Complexity, 2016, 29(3): 752-771.
[8] 兰绍军,唐应辉.具有Bernoulli反馈和Min(N,D)-策略控制的离散时间可修排队的可靠性分析[J].系统科学与数学,2016,36(11):2070-2086.
[9] 高丽君,唐应辉.具有Min(N,D)-策略控制的M/G/1可修排队系统及最优控制策略[J].数学物理学报,2017,37(2):352-365.
[10] 潘取玉,唐应辉.在延迟Min(N,D)-控制策略下修理设备可更换的M/G/1可修排队系统及最优控制策略[J].数学物理学报,2018,38(5):184-201.
[11] Lee H W, Park J G. Optimal strategy in N-policy production system with early set-up[J]. The Journal of the Operational Research Society, 1997, 48(3): 306-313.
[12] Lee H W, Park J G, Kim B K. Queue length and waiting time analysis of a batch arrival queue with bi-level control[J]. Computers & Operations Research, 1998, 25(3): 191-205.
[13] Lee H W, Park N I, Jeon J. Queue length analysis of batch arrival queues under bi-level threshold control with early set-up[J]. International Journal of Systems Science, 2003, 34(3): 195-204.
[14] Ke J C . Bi-level control for batch arrival queues with an early startup and unreliable server[J]. Applied Mathematical Modelling, 2004, 8(5): 469-485.
[15] 刘名武,杨迎春,马永开.一类排队服务系统的最优控制策略研究[J].控制理论与应用,2012,29(3):323-330.
[16] Luo C Y, Tang Y H, Yu K Z, et al. Optimal (r,N)-policy for discrete-time Geo /G∕1 queue with different input rate and setup time[J]. Applied Stochastic Models in Business & Industry, 2015, 31(4): 405-423.
[17] 曹晋华,程侃.服务台可修的M/G/1排队系统分析[J].应用数学学报,1982,5(2):113-127.
[18] 曹晋华.服务设备可修的机器服务模型分析[J].数学研究与评论,1985,5(4):89-96.
[19] Tang Y H. A single-server M/G/1 queueing system subject to breakdowns——some reliability and queueing problems[J]. Microelectronics & Reliability, 1997, 37(2): 315-321.
[20] 唐应辉,赵玮.可修排队系统可靠性指标的分解特性[J].运筹学学报,2004,8(4):73-84.
[21] Tang Y H. Revisiting the model of servicing machines with repairable service facility—a new analyzing idea and some new results[J]. Acta Mathematicae Applicatae Sinica, 2010, 26(4): 557-566.
[22] 唐应辉,冯慧侠,吴文青.修理设备可更换的M/G/1可修排队系统分析[J].系统工程学报,2013,28(6):830-839.
[23] 唐应辉,朱亚丽,吴文青.修理设备可更换的N-策略M/G/1可修排队系统分析[J].系统工程理论与实践,2014,34(3):746-755.
[24] 蔡晓丽,唐应辉.具有温储备失效特征和单重休假Min(N,V)-控制策略的M/G/1可修排队系统[J].应用数学学报,2017,40(5):692-701.
[25] Lan S J, Tang Y H. Performance and reliability analysis of a repairable discrete-time Geo/G/1 queue with Bernoulli feedback and randomized policy[J]. Applied Stochastic Models in Business and Industry, 2017, 33(5): 522-543.
[26] 唐应辉,唐小我.排队论—基础与分析技术[M].北京:科学出版社,2006.
[27] 曹晋华,程侃.可靠性数学引论(修订版)[M].北京:高等教育出版社,2006. |