[1] MEERSMANS P J M, WAGELMANS A P M. Effective algorithms for integrated scheduling of handling equipment at automated container terminals: ERIM Report Series Research in Management[R]. Rotterdam: Erasmus University, 2001. [2] HOMAYOUNI S M, TANG S H, MOTLAGH O. A genetic algorithm for optimization ofintegrated scheduling of cranes, vehicles, and storage platforms at automated container terminals[J]. Journal of Computational and Applied Mathematics, 2014, 270: 545-556. [3] 吴远焰,朱瑾,刘彪,等.自动化码头核心设备集成调度优化[J].计算机仿真,2018,35(3):381-384+421. [4] LAU H Y K, ZHAO Y. Integrated scheduling of handling equipment at automated container terminals[J]. Annals of Operations Research, 2008, 159(1): 373-394. [5] 栾晨,韩笑乐.自动化集装箱码头装卸系统的协同调度优化[J].机械制造,2018,56(4):84-88. [6] YANG Y S, ZHONG M S,DESSOUKY Y, et. al. An integrated scheduling method for AGV routing in automated container terminals[J]. Computers & Industrial Engineering, 2018, 126: 482-493. [7] LUO J B, WU Y. Scheduling of container-handling equipment during the loading process at an automated container terminal[J]. Computers & Industrial Engineering, 2020,149: 106848. [8] 仲美稣,杨勇生,周亚民,等.基于群智能算法的自动化码头协同调度研究[J].计算机应用研究,2019,36(12):3756-3759. [9] ANGELOUDIS P, BELL M G H. An uncertainty-aware AGV assignment algorithm for automated container terminals[J]. Transportation Research Part E: Logistics and Transportation Review, 2010, 46(3): 354-366. [10] LU Y Q, LE M L. The integrated optimization of container terminal scheduling with uncertain factors[J]. Computers & Industrial Engineering, 2014, 75: 209-216. [11] LEGATO P, MAZZA R M, TRUNFIO R. Simulation-based optimization for discharge/loading operations at a maritime container terminal[J]. OR Spectrum, 2010, 32(3): 543-567. [12] AL-DHAHERI N, JEBALI A, DIABAT A. A simulation-based genetic algorithm approach for the quay scheduling under uncertainty[J]. Simulation Modelling Practice and Theory, 2016, 66: 122-138. [13] 常祎妹,朱晓宁.不确定因素下的集装箱码头车船间装卸作业集成调度[J].交通运输工程学报,2017,17(6):115-124.