[1] Page E S. Continuous inspection schemes[J]. Biometrika, 1954, 41: 100-115. [2] Ewan W D. When and how to use Cusum charts[J]. Technometrics, 1963, 15: 1-22. [3] Ewan W D. Kemp K W. Sampling inspection of continuous processes with no autocorrelation between successive results[J]. Biometrika, 1960, 47(3): 363-380. [4] Johnson N L, Leone F C. Cumulative sum control charts—mathematical principles applied to their construction and use[J]. Industrial Quality Control, 1962, (6): 15-21, (7): 29-36,(8): 22-28. [5] Vaughan T S. Variable sampling intervals np process control chart[J].Communication in Statistical-Theory and Methods, 1993, 26: 147-167. [6] 薛丽.可变抽样区间的几何EWMA控制图设计[J].统计与决策,2010,19:43-45. [7] 薛丽.可变抽样区间的几何EWMA控制图经济设计的设计[J].运筹与管理,2013,22(4):126-132. [8] Reynolds M R Jr, Amin R W, Arnold J C. CUSUM charts with variable sampling intervals[J]. Technometrics, 1990, 32: 371-384. [9] Chang Y S, Bai D S. Control charts for positively skewed populations with weighted standard deviations[J]. Quality and Reliability Engineering International, 2001, 17(5): 397-406. [10] Schilling E G, Nelson P R. The effect of non-normality on the control limits of X-bar charts[J]. Journal of Quality Technology, 1976, 8(3): 183-188. [11] Chen Y K. Economic design of control charts for non-normal data using variable sampling policy[J]. International Journal of Production Economics, 2004, 92: 61-74. [12] Chou C Y, Chen C H, Liu H R. Economic-statistical design of charts for non-normal data by considering quality loss[J]. Journal of Applied Statistics, 2000, 27(8): 939-951. [13] Lin Y C, Chou C Y. On the design of variable sample size and sampling intervals charts under non-normality[J]. International Journal of Production Economics, 2005, 96(2): 249-261. [14] Burr I W. Cumulative frequency distribution[J]. Annals of Mathematical Statistics, 1942, 13(2): 215-232. [15] Burr I W. Parameters for a general system of distributions to match a grid of and[J]. Communications in Statistics, 1973, 2(1): 1-21. |