[1] Chen C H, Ling S F, Chen W. Project scheduling for collaborative product development using DSM[J]. International Journal of Project Management, 2003, (21): 291-299. [2] Artigues C, Michelon P, Reusser S. Insertion techniques for static and dynamic resoure-constrained project scheduling[J]. European Journal of Operational Research, 2003, 149(2): 249-267. [3] Bouleimen K, Lecocq H. A new efficient simulated annealing algorithm for resource-constrained project scheduling problem and its multiple mode version[J]. European Journal of Operational Research, 2003, 149(2): 268-281. [4] Ying Y, Shou Y Y, Li M. Hybrid genetic algorithm for resource constrained multi-project scheduling problem[J]. Journal of Zhejiang University:Engineering Science, 2009, 43(1): 23-27 [5] Buddhakulsomsiri J, David S K. Priority rule-based heuristic for multi-mode resource constrained project scheduling problems with resources vacations and activity splitting[J]. European Journal of Operational Research, 2007, 178(2): 374-390. [6] CHENG Xu,WU Cheng. Solving multi-mode project rescheduling problem with PSO algorithm[J]. Computer Integrated M anufacturing Systems, 2009, 15(1): 97-101. [7] Steward D V. The design structure system: a method for managing the design of complex systems[J]. IEEE Trans Eng Manage, 1981, 28(3): 71-74. [8] Krishnan V, Eppinger S D, Whitney D E. A model-based framework to overlap product development activities[J]. Management Science, 1997, 43(4): 437-451. [9] Shi Y, Eberhart R C. A modified particle swarm optimizer[J]. Proceedings of IEEE International Conference on Evolutionary Computation, Anchorage, 1998. 69-73. [10] Angeline P J. Using selection to improve particle swarm optimization[J]. Proceeding of the 1999 Congtess on Evolutionary Computation, Piscataway:IEEE Press, 1999. 84-89. [11] Baskar S, Suganthan P N. A novel concurrent particle swarm optimization[J]. Proceedings of the, 2004 Congress on Evolutionary Computation, Piscataway: IEEE Press, 2004. 792-796. |