[1] Venkatesan M. Production-inventory with equipment replacement-PIER[J]. Operations Research, 1984, 32(6): 1286-1295. [2] Scherer W T, Glagola D M. Markovian models for bridge maintenance management[J]. Journal of Transportation Engineering, 1994, 120(1): 37-51. [3] Montoro C D, Perez O R. Replacement times and costs in a degrading system with several types of failure: the case of phase-type holding times[J]. European Journal of OperationalResearch, 2006, 175: 1193-1201. [4] Cesare A, Santamarina C, Turkstra C, Vanmarcke E H. Modeling bridge deterioration with markov chains [J]. Journal of Transportation Engineering, 1992, 118(6): 820-833. [5] Hoskins R P, Strbac G, Brint A T. Modelling the degradation of condition indices[J]. IEE Proceedings of Generation, Transmission and Distribution, 1999, 146(4): 386-392. [6] Ettoumi F Y, Sauvageot H, Adane A E H. Statistical bivariate modelling of wind using first-order markov chain and weibull distribution[J]. Renewable Energy, 2003, 28: 1787-802. [7] Hoskins R P, Strbac G, Brint A T. Modelling the degradation of condition indices[J]. IEE Proceedings of Generation, Transmission and Distribution, 1999, 146(4): 386-392. [8] Elwany A H, Gebraeel N Z. Sensor-driven prognostic models for equipment replacement and spare parts inventory[J]. IIE Transactions, 2008, 40(7): 629-639. [9] Armstrong M, Atkins D. Joint optimization of maintenance and inventory policies for a simple system[J]. IIE Transactions, 1996, 28(5): 415-424. [10] Zohrul K A B M, Ahmed S A O. A stocking policy for spare part provisioning under age based preventive replacement[J]. Euvopean Journal of Operatconal Research, 1996, 90(1): 171-181. [11] Cheung K L, Hausman W H. Joint determination of preventive maintenance and safety stocks in an unreliable production environment[J]. Naval Research Logistics, 1997, 44: 257-272. [12] Vaughan T. Failure replacement and preventive maintenance spare parts ordering policy[J]. European Journal of Operational Research, 2005, 161: 183-190. [13] 崔南方, 丁留明.基于零件寿命函数的慢速流动备件库存模型[J].系统工程,2006,24(9):24-31. [14] 丁留明,崔南方,李晋.基于设备使用周期的备件库存控制模型研究[J].工业工程,2007,10(3):70-76. [15] 司书宾,贾大鹏,孙树栋,王宁.服务水平约束下的多-单维修备件协同库存控制模型及其仿真研究[J].中国机械工程,2007,18(23):2844-2847. [16] 王乃超,康锐,程海龙.基于马尔科夫过程的备件库存动态特性分析[J].兵工学报,2009,7:984-988. |