[1]Sepehri M, Fayazbakhsh K. A multi-period and multi-product optimizer for cooperative supply chains[J]. South African Journal of Business Management, 2012, 43(1): 77-91. [2]Agnetis A, Hall N G, Pacciarelli D. Supply chain scheduling: sequence coordination[J]. Discrete Applied Mathematics, 2006, 154(15): 2044-2063. [3]Fawcett S E, Magnan G N. Rhetoric and reality of supply chain management[J]. International Journal of Physical Distribution and Logistics Management, 2002, 32(5): 339-361. [4]Chen Z L. Integrated production and outbound distribution scheduling: review and extensions[J]. Operations Research, 2010, 58(1): 130-148. [5]Stecke K E, Zhao X. Production and transportation integration for make-to-order manufacturing company with a commit-to-delivery business mode[J]. Manufacturing & Service Operations Management, 2007, 9(2): 206-224. [6]Nagurney A. Optimal supply chain network design and redesign at minimal total cost and with demand satisfaction[J]. International Journal of Production Economics, 2010, 128(1): 200-208. [7]Chen Z L, Vairktarakis G L. Integrated scheduling of production and distribution operations[J]. Management Science, 2005, 51(4): 614-628. [8]裴军,刘心报,范雯娟等.基于生产与运输集成的供应链调度优化问题[J].中国管理科学,2012,20(11):583-593. [9]陈荣军,唐国春.同类机的供应链排序仁[J].系统工程学报,2010,25(l):62-65. [10]蒋大奎,李波.基于棍合禁忌搜索算法的供应链排序问题[J].机械工程学报,2011,47(20):53-59. [11]Li H, Keith W. Modeling the supply chain configuration problem with resource constraints[J]. International Journal of Project Management, 2008, 26(6): 646-654. [12]Parviz G, Ehsan E, Shirin J, Ashtad J. Multi-mode resource-constrained discrete time-cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm[J]. Automation in construction, 2013, (3), 30: 216-227. [13]Vanhoucke M, Debels D. The impact of various activity assumptions on the lead time and resource utilization of resource-constrained projects[J]. Computers and Industrial Engineering, 2008, 54(1): 140-154. [14]Buddhakulsomsiri J, Kim D. Properties of multi-mode resource-constrained project scheduling problems with resource vacations and activity splitting[J]. European Journal of Operational Research, 2006, 175(1): 279-295. |