[1] Yihsu C, Andrew L L, Benjamin F H. Economic and emissions implications of load-based, source-based, and first-seller emissions trading programs under california AB32[J]. Operations Research, 2011, 59(3): 696-712. [2] Sana S S. A production-inventory model of imperfect quality products in a three-layer supply chain[J]. Decision Support Systems, 2011, 50(2): 539-547. [3] Jha J K, Shanker K. Single-vendor multi-buyer integrated production-inventory model with controllable lead time and service level constraints[J]. Applied Mathematical Modelling, 2013, 37(2): 1753-1767. [4] Jonrinaldi D Z, Zhang D Z. An integrated production and inventory model for a whole manufacturing supply chain involving reverse logistics with finite horizon period[J]. Omega, 2013, 41(3): 598-620. [5] Chen X, Benjaafar S, Elomri A. The carbon-constrained EOQ[J]. Operations Research Letters, 2013, 41(2): 172-179. [6] Dobos I. Tradable permits and production-inventory strategies of the firm[J]. International Journal of Production Economics, 2007, 108(7): 329-333. [7] Li S, Gu M. The effect of emission permit trading with banking on firm’s production-inventory strategies[J]. International Journal of Production Economics, 2012, 137(6): 304-308. [8] Jira C F, Toffel M W. Engaging supply chain in climate change[J]. Manufacture & Service Operations Research, 2013, 15(4): 559-577. [9] Hua G, Cheng T C E, Wang S Y. Managing carbon footprints in inventory management[J]. International Journal of Production Economics, 2011, 132(8): 178-185. [10] Bonney M, Mohamad Jaber Y. Environmentally responsible inventory models: non-classical models for a non-classical era[J]. International Journal of Production Economics, 2011, 133(9): 43-53. [11] Wahab M I M, Mamun S M H, Ongkunaruk P. EOQ models for a coordinated two-level international supply chain considering imperfect items and environmental impact[J]. International Journal of Production Economics, 2011, 134(11): 151-158. [12] Chen C, Monahan G E. Environmental safety stock: the impacts of regulatory and voluntary control policies on production planning, inventory control, and environmental performance[J]. European Journal of Operational Research, 2010, 207(12): 1280-1292. [13] 张旭梅,邱晗光,陈军.补货能力影响部分短缺量拖后率的边补货边需求EOQ模型[J].中国管理科学,2008,16(1):96-103. [14] 杜少甫,董骏峰,梁樑,张靖江.考虑排放许可与交易的生产优化[J].中国管理科学,2009,17(3):81-86. [15] Du S F, Zhu L L, Liang L, Ma F. Emission-dependent supply chain and environment-policy-making in the ‘cap-and-trade’ system[J]. Energy Policy, 2013, 57: 61-67. [16] 陶雪飞,曹华军,李洪丞,刘飞.基于碳排放强度系数的产品物料消耗评价方法及应用[J].系统工程,2011,29(2):123-126. [17] Palmer A. The development of an integrated routing and carbon dioxide emissions model for goods vehicles[D]. Cranfield University, 2008. |