[1] 马铁焰.《水利水电土建工程施工合同条件》下的业主索赔[J].四川水力发电,2006,S2:62-64. [2] Bunni N G. The FIDIC form of contract: the fourth edition of the red book[M]. Oxford: Blackwell Science, 1997. [3] Hinze J W. Construction planning and scheduling[M]. Pearson Higher Ed, 2011. [4] 苏志雄,乞建勋,阚芝南.求解CPM网络计划的最大网络时差[J].运筹与管理,2014,01:33-38. [5] 乞建勋,张立辉,李星梅.网络计划管理中的机动时间的特性理论及其应用[M].北京:科学出版社,2009. [6] 乞建勋,李星梅,王强.等效子网络构建的理论与方法[J].管理科学学报,2010,(1):40-44. [7] 刘英杰,孟凡玲,冯平.基于总时差分配的工期索赔研究[J].水电能源科学,2010,(2):122-124. [8] 秦浩安.工期延误如何索赔[J].施工企业管理,2014,10:34-35. [9] 张丽霞,韦福祥.工期索赔中的工序延迟分析[J].数学的实践与认识,2007,07:20-26. [10] 吕胜普,李建设,杨飞雪.多事件交叉干扰下的工期索赔方法[J].土木工程学报,2005,11:112-116+127. [11] Kamrul Ahsana, Indra Gunawan. Analysis of cost and schedule performance of international development projects[J]. International Journal of Project Management, 2010, 28(1): 68-78. [12] Han S H, Yun S, Kim H, et al. Analyzing schedule delay of mega project: lessons learned from korea train express[J]. Engineering Management, IEEE Transactions on, 2009, 56(2): 243-256. [13] Flyvbjerg B. Mega delusional: the curse of the mega project[J]. New Scientist, 2013, 220(2945): 28-29. [14] Adam A, Josephson P E, Lindahl G. Implications of cost overruns and time delays on major public construction projects[C]. Proceedings of the 19th International Symposium on the Advancement of Construction Management and Real Estate, 7-9 Nov 2014, Chongqing. 2014. [15] Aigbavboa C O, Thwala W D. An exploratory study of the major causes of construction disputes in the south african construction sector[C]. Applied Research Conference in Africa, 2014. [16] Hwang B G, Zhao X, Ng S Y. Identifying the critical factors affecting schedule performance of public housing projects[J]. Habitat International, 2013, 38: 214-221. [17] Yang J B, Kao C K. Critical path effect based delay analysis method for construction projects[J]. International Journal of Project Management, 2012, 30(3): 385-397. |