[1] Norrman A. Ericsson’s proactive supply chain risk management approach after a serious sub-supplier accident[J]. International Journal of Physical Distribution & Logistics Management, 2004, 34(5): 434-456. [2] 邵鲁生,秦绪伟.面向供应节点失效的供应链应急策略研究[J].管理学报,2013,10(6):913-918. [3] Tang C S. Perspectives in supply chain risk management[J]. International Journal of Production Economics, 2006, 103(2): 451-488. [4] Snyder L V, Shen Z J M. Managing disruption to supply chains, forthcoming in the bridge(national academy of engineering), 2006. [5] Sheffi Y, Rice J. A supply chain review of the resilient enterprise[J]. MIT Sloan Management Reivew, 2005, 47(1): 41-48. [6] Blackhurst J, Craighead C W, Elkins D, Handfield R B. An empirically derived agenda of critical research issues for managing supply-chain disruptions[J]. International Journal of Production Research, 2005, 43(19): 4067-4081. [7] Tang CS, Tomlin B. The power of flexibility for mitigating supply chain risks[J]. International Journal of Production Economics, 2008, 116(1): 12-27. [8] Mitra K, Gudi R D, Patwardhan S C, Sardar G. Towards resilient supply chains: Uncertainty analysis using fuzzy mathematical programming[J]. Chemical Engineering Research & Design, 2009, 87(7): 967-981. [9] Klibi W, Martel A. Modeling approaches for the design of resilient supply networks under disruptions[J]. International Journal of Production Economics, 2012, 135(2): 882-898. [10] Klibi W, Martel A. Scenario-based supply chain network risk modeling[J]. European Journal of Operational Research, 2012, 223(3): 644-658. [11] Xiao R B, Yu T Y, Gong X G. Modeling and simulation of ant colony’s labor division with constraints for task allocation of resilient supply chains[J]. International Journal on Artificial Intelligence tools, 2012, 21(3). [12] Carvalho H, Barroso AP, Machado VH, Azevedo S, Cruz-Machado V. Supply chain redesign for resilience using simulation[J]. Computers & Industrial Engineering, 2012, 62(1): 329-341. [13] Sawik T. Selection of supply portfolio under disruption risks[J]. Omega-International Journal of Management Science, 2011, 39(2): 194-208. [14] Sawik T. Selection of resilient supply portfolio under disruption risks[J]. OMEGA-International Journal of Management Science, 2013,41(2): 259-269. [15] Sarkar A, Mohapatra P K J. Determining the optimal size of supply base with the consideration of risks of supply disruptions[J]. International Journal of Production Economics, 2009, 119(1): 122-135. [16] 刘家国,周粤湘,卢斌,赵金楼.基于突发事件风险的供应链脆弱性削减机制[J].系统工程理论与实践,2015,35(3):556-566. [17] 杨建华,牛坤,于本海,范德明.买方市场时效性产品的供应链弹性契约优化模型[J].中国管理科学,2013,21(5):80-85. [18] 蔡政英,肖人彬.中断环境下供应链弹性运作分析与优化[J].系统工程理论与实践,2013,34(6):1443-1452. [19] Maravelias C T, Grossmann I E. A hybrid MILP/CP decomposition approach for the continuous time scheduling of multipurpose batch plants[J]. Computers and Chemical Engineering, 2004, 28(10): 1921-1949. [20] Jain V, Grossmann I E. Algorithms for hybrid MILP/CLP models for a class of optimization problems[J]. INFORMS Journal on Computing, 2001, 13(4): 258-276. [21] Magatao S N B, Magatao L, Neves F, Arruda L V R. Novel MILP decomposition approach for scheduling product distribution through a pipeline network[J]. Industrial & Engineering Chemistry Research, 2015, 54(18): 5077-5095. [22] Steinrucke M. Integrated production, distribution and scheduling in the aluminium industry: a continuous-time MILP model and decomposition method[J]. International Journal of Production Research, 2015, 53(19): 5912-5930. |