[1] Herroelen W, Leus R. Project scheduling under uncertainty: survey and research potentials[J]. European Journal of Operational Research, 2005, 165(2): 289-306. [2] Van De Vonder S, Demeulemeester E, Herroelen W. Proactive heuristic procedures for robust project scheduling: an experimental analysis[J]. European Journal of Operational Research, 2008, 189(3): 723-733. [3] Bruni M E, Di P P L, Beraldi P, et al. An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations[J]. Omega, 2017. 66-84. [4] Liang Y, Cui N, Wang T, et al. Robust resource-constrained max-NPV project scheduling with stochastic activity duration[J] OR Spectrum, 2019, 41. 219-254. [5] 崔南方,梁洋洋.基于资源流网络与时间缓冲集成优化的鲁棒性项目调度[J].系统工程理论与实践,2018,38(1):102-112. [6] Deblaere F, Demeulemeester E, Herroelen W. Reactive scheduling in the multi-mode RCPSP[J]. Computers & Operations Research, 2011, 38(1): 63-74. [7] Ghoddousi P, Ansari R, Makui A. An improved robust buffer allocation method for the project scheduling problem[J]. Engineering Optimization, 2016, 49(4): 718-731. [8] 王艳婷,何正文,刘人境.随机工期下反应性多模式项目调度优化[J].系统管理学报,2017(1):85-93. [9] Davari M, Demeulemeester E. Important classes of reactions for the proactive and reactive resource-constrained project scheduling problem[J]. Annals of Operations Research, 2019, 274(1-2): 187-210. [10] Herroelen W, Leus R. The construction of stable project baseline schedules[J]. European Journal of Operational Research, 2004, 156(3): 550-565. [11] Hansen P, Mladenovic' N, Pérez JAM. Variable neighbourhood search: methods and applications[J]. Annals of Operations Research, 2010, 175(1): 367-407. [12] Tian H, Li K, Liu W. A pareto-based adaptive variable neighborhood search for biobjective hybrid flow shop scheduling problem with sequence-dependent setup time[J]. Mathematical Problems in Engineering, 2016, 2016(2): 1-11. |