[1] Harris F. How many parts to make at once[J]. The Magazine of Management, 1913, 10(2): 135-136. [2] Wanger H, Whitin T. Dynamic version of the economic lot size model[J]. Management Science, 1959, 5(1): 89-96. [3] Sandbothe Thompson R G. A forward algorithm for the capacitated lot size model with stockouts[J]. Operational Research, 1990, 38(3): 474-486. Sandbothe Thompson R G. Decision horizons for the capacitated lot size model with inventory bounds and stockouts[J]. Computers and Operations Research, 1993, 20(5): 455-465. [4] Aksen A K, Altinkemer Chand S. The single-item lot-sizing problem with immediate lost sales[J]. European Journal of Operational Research, 2003, 147(3): 558-566. [5] Feng Chu, Chengbin Chu. Polynomial algorithms for single item lot sizing models with bounded inventory and backlogging or outsourcing[J]. IEEE transactions on automation science and engineering, 2007, 4(2): 233-251. [6] Feng Chu, Chengbin Chu. Single-item dynamic lot sizing models with bounded inventory and outsourcing[J]. IEEE transactions on systems,man and cybernetics-part a:systems and humans,2008, 38(1): 70-77 [7] Liu X, Chu F, Chu C, Wang C. Lot sizing with bounded inventory and lost sales[J]. International Journal of production research.2007, 45(24): 5881-5894 . [8] Richter K, Sombrutzki M. Remanufacturing planning for the reverse wagner/whitin models[J]. European Journal of Operational Research, 2000, 121: 304-315. [9] Richter K, Weber J. The reverse wagner-Whitin model with variable manufacturing and remanufacturing cost[J]. International Journal of Production Economics, 2001, 71: 447-456. [10] Golany B, et al.. Economic lot-sizing with remanufacturing options[J]. IIE Transactions, 2001, 33: 995-1003. [11] Teunter R, et al.. Dynamic lot sizing with product returns and remanufacturing[J]. International Journal of Production Research, 2006, 44(20): 4377-4400. |