YANG Ming, LU Xi-wen, WANG Lei-yang. Online Preemptive Scheduling of Two-machine Flow Shops[J]. Operations Research and Management Science, 2011, 20(5): 27-30.
[1] Graham R L, Lawler E L, Lenstra J K. Optimization and approximation in deterministic sequencing and scheduling: a survey[J]. Annals of Discrete Mathematics, 1979, 5: 287-326. [2] Lenstra J K, Kan R, Brucker P. Complexity of machine scheduling problems[J]. Annals of Discrete Mathematics, 1977, 1: 343-362. [3] Potts C N. Analysis of heuristics for two-machine flow-shop sequencing subject to release dates[J]. Mathematics of Operations Research, 1985, 10(4): 576-584. [4] Kashyrskikh K H, Potts C N, Sevastianov S V. A 3/2-approximation algorithm for two-machine flow-shop sequencing subject to release dates[J]. Discrete Applied Mathematics, 2001, 114: 255-271. [5] Gonzalez T, Sahni S. Flow shop and job shop schedules: complexity and approximation[J]. Operations Research, 1978, 26(1): 36-52. [6] Cho Y, Sahni S. Preemptive scheduling of independent jobs with release and due times on open. Flow and Job Shops[J]. Operations Research, 1981, 29(3): 511-522. [7] Chen B, Woeginger G J. A study of on-line scheduling two-stage shops[M]. Du D Z, Pardalos P. Minimax and Applications, Netherlands: Kluwer Academic Publishers , 1995. 97-107. [8] Johnson S M. Optimal two-and-three-stage production schedules with set-up times included[J]. Naval Research Logistics Quart, 1954, 1: 61-68.