[1] Lee K J, Lee J K, Choi S Y. A Spatial Scheduling System and its Application to Shipbuilding: DAS-CURVE[J]. Expert System with Application, 1996, 10(3): 311-324. [2] Lee K J, Lee J K, Park K H. Developing scheduling systems for daewoo shipbuilding: DAS project[J]. European Journal of Operational Research, 1997, 97(2): 380-395. [3] Park K, Lee K, Park S. Modeling and solving the spatial block scheduling problem in a shipbuilding company[J]. Computer Industrial Engineering, 1996, 30(3): 357-364. [4] 郭美娜,李波.基于树搜索的一种动态空间调度方法[J].计算机工程与应用,2007,43(14):180-183. [5] 张志英,马姗静.基于综合分解策略的船体分段空间调度方法[J].机械工程学报,2010,46(22):189-194 [6] Cho K K, Lee D, Oum T H. An intelligent spatial planning and scheduling system[C]. roceedings of the 6th Annual International Conference on Industrial Engineering-teory, Application and Practice. San Francisco, CA, USA, 2001, November 18-20. [7] Raj P. Solving spatial scheduling problem: an analytical approach[C]. Proceeding of the 37th International Conference on Computers and Industrial Engineering. Alexandria, Egypt, 2007.2002-2011. [8] 张志英,陈洁.空间调度问题的非线性规划分析求解方法[J].计算机集成制造系统,2010,16(6):1272-1278 [9] Varghese R J, Yoon D Y. Dynamic spatial block arrangement scheduling in shipbuilding industry using genetic algorithm[C]. Third IEEE International Conference on Industrial informatics, India, 2005. 444-449. [10] Li B, Zhao Z Y, Li G. A Dynamic scheduling metheod for spatial layout planning[C]. Proceedings of the 4th International Conference on Machine Learning and Cybernetics, Guangzhou, August 18-21, 2005. [11] Koh S H, Jang J H. GA-based spatial scheduling algorithm for mega-block assembly yard in shipbuilding company[C]. Proceedings of the 9th Asia Pacific Industrial Engineering and Management Systems Conference. Bali-Indonesia, 2008, December 3-5. [12] 张志英,杨克开,于瑾维,陈强.改进粒子群算法的动态空间调度方法[J].哈尔滨工程大学学报,2009, 30(12):1344-1350. [13] Holland J H. Adaptation in natural and artificial systems: an Introductory analysis with applications to biology, control, and Artificial Intelligence[M]. MIT press, Cambridge, USA. 1992. [14] Martello S, Lodi A, Vigo D. Two-dimensional packing problems: a survey[J]. European Journal of Operational Research, 2002, 141(2): 241-252. |