Optimization on Tugboat Operation Mode Considering Characteristics of the Multi-stage Common Parallel Machines
XU Qi1, LI Na1,2, JIN Zhi-hong1
1. College of Transportation, Dalian Maritime University, Dalian 116026, China; 2. Institute of System Engineering, Dalian University of Technology, Dalian 116024, China
XU Qi, LI Na, JIN Zhi-hong. Optimization on Tugboat Operation Mode Considering Characteristics of the Multi-stage Common Parallel Machines[J]. Operations Research and Management Science, 2014, 23(5): 178-186.
[1] Jin Z, Yang Z, Ito T. Metaheuristic algorithms for the multistage hybrid flowshop scheduling problem[J]. International Journal of Production Economics, 2006, 100(2): 322-334. [2] Low C, Hsu C J, Su C T. A two-stage hybrid flowshop scheduling problem with a function constraint and unrelated alternative machines[J]. Computers and Operations Research. 2008, 35(3): 845- 853. [3] Naderi B, Zandieh M, Khaleghi Ghoshe Balagh A, et al. An improved simulated annealing for hybrid flowshops with sequence-dependent setup and transportation times to minimize total completion time and total tardiness[J]. Expert Systems with Applications. 2009, 36(6): 9625-9633. [4] 何涛,朱宏辉.遗传算法在拖轮调度中的应用[J].物流技术,2008,27(4):138-139. [5] Ying K C, Lin S W. Multiprocessor task scheduling in multistage hybrid flow-shops: an ant colony system approach[J]. International Journal of Production Research, 2006, 44(16): 3161-3177. [6] 肖建华.多处理器任务调度问题的新近似算法[J].计算机工程,2005,31(24):50-52+60. [7] 轩华,唐立新.带多处理器任务的动态混合流水车间调度问题[J].计算机集成制造系统,2007,13(11):2254-2260+2288. [8] 刘志雄,王少梅.基于粒子群算法的并行多机调度问题研究[J].计算机集成制造系统,2006,12(2):183-187. [9] 刘志雄.考虑最短距离作业的港口拖轮作业调度优化[J].西南交通大学学报,2011,46(5):875- 881. [10] 刘志雄.基于一般集合多处理器任务的港口拖轮作业调度优化研究[R].天津:天津港(集团)有限公司博士后出站报告,2011. [11] Su Wang I K G C. Research on the modeling of tugboat assignment problem in container terminal[J]. Advanced Materials Research, 2012, 433- 440: 1957-1961.