[1] Ling K, Shalaby A. Automated transit headway control via adaptive signal priority[J]. Journal of advanced transportation, 2004, 38(1): 45-67. [2] Ting C J, Schonfeld P. Dispatching control at transfer stations in multi-hub transit networks[J]. Journal of Advanced Transportation, 2007, 41(3): 217-243. [3] Lam S W, Tang L C, Goh T N, Halim T. Multiresponse optimization of dispatch rules for public bus services[J]. Computers & Industrial Engineering, 2009, 56(1): 77-86. [4] Chowdhury S M, I-Jy Chien S. Intermodal transit system coordination[J]. Transportation Planning and Technology, 2002, 25(4): 257-287. [5] Chowdhury M S, Chien S I J. Dynamic vehicle dispatching at the intermodal transfer station[J]. Transportation Research Record: Journal of the Transportation Research Board, 2001, 1753(1): 61-68. [6] Dessouky M, Hall R, Zhang L, Singh A. Real-time control of buses for schedule coordination at a terminal[J]. Transportation Research Part A: Policy and Practice, 2003, 37(2): 145-164. [7] Higgins A, Kozan E, Ferreira L. Optimal scheduling of trains on a single line track[J]. Transportation Research Part B: Methodological, 1996, 30(2): 147-161. [8] Zhao J, Dessouky M, Bukkapatnam S. Optimal slack time for schedule-based transit operations[J]. Transportation Science, 2006, 40(4): 529-539. [9] Ting C J, Schonfeld P. Schedule coordination in a multiple hub transit network[J]. Journal of urban planning and development, 2005, 131(2): 112-124. [10] Ding Y, Chien S. The prediction of bus arrival times with link-based artificial neural networks[C]//Proceedings of the international conference on computational intelligence and neurosciences(CI&N)—intelligent transportation systems. Atlantic City, New Jersey. 2000: 730-739. [11] Chien S I J, Ding Y, Wei C. Dynamic bus arrival time prediction with artificial neural networks[J]. Journal of Transportation Engineering, 2002, 128(5): 429-438. [12] Chen M, Liu X, Xia J, Chien S I. A dynamic bus-arrival time prediction model based on APC data[J]. Computer-Aided Civil and Infrastructure Engineering, 2004, 19(5): 364-376. [13] Yao B Z, Yang C Y, Yao J B. Tunnel surrounding rock displacement prediction using support vector machine[J]. International Journal of Computational Intelligence Systems, 2010, 3(6): 843-852. [14] Yao B Z, Yao J B, Zhang M H. Multi-step-ahead prediction for tunnel surrounding rock displacement using support vector machine[J]. Scientia Iranica, in press. (2013) [15] Yao B Z, Hu P, Lu X H, Gao J J, Zhang M H. Transit network design based on travel time reliability[J]. Transportation Research Part C, DOI:10.1016/j.trc.2013.12.005, in press.(2013) [16] Yu B, Yang Z Z, LI S. “Real-time partway deadheading strategy based on transit service reliability assessment”[J]. Transportation Research Part A, 2012, 46(8): 1265-1279. [17] Yu B, Yang Z Z, Chen K, Yu B. A hybrid model for bus arrival time prediction[J]. Journal of Advanced Transportation, 2010, 44(3): 193-204. [18] Vapnik V N. An overview of statistical learning theory[J]. Neural Networks, IEEE Transactions on, 1999, 10(5): 988-999. [19] Vapnik V. The nature of statistical learning theory[M]. springer, 2000. [20] 姚宝珍,于滨,杨忠振.基于公交车到站时间预测的动态滞站调度模型[J].北京工业大学学报,2011,37(6):869-875. [21] Yu B, Yang Z Z. “An ant colony optimization model: the period vehicle routing problem with time windows”[J]. Transportation Research Part E, 2011, 47(2): 166-18. [22] Yu B, Yang Z Z, JIN P H, Wu Hua S, Yao B Z. Transit route network design using ant colony optimization[J]. Transportation Research Part C, 2012, 22: 58-75. [23] Yu B, Zhu H B, Cai W J, Ma N, Yao B Z. Two-phase optimization approach to transit hub location the case of dalian[J]. Journal of Transport Geography, 2013, 33: 62-71. [24] 陈彦如,蒲云.用遗传算法解决固定需求交通平衡分配问题[J].西南交通大学学报,2000,35(1):44-47. |