[1] Bierwirth C, Meisel F. A follow-up survey of berth allocation and quay crane scheduling problems in container terminals[J]. European Journal of Operational Research, 2015, 244(3): 675-689. [2] Park Y M, Kim K H. A scheduling method for berth and quay cranes[J]. OR Spectrum, 2003, 25(1): 1-23. [3] Huang Y, Liang C, Yang Y.The optimum route problem by genetic algorithm for loading/unloading of yard crane[J]. Computers & Industrial Engineering, 2009, 56(3): 993-1001. [4] Zhang C, Zheng L, Zhang Z, et al. The allocation of berths and quay cranes by using a sub-gradient optimization technique[J]. Computers & Industrial Engineering, 2010, 58(1): 40-50. [5] 李娜,靳志宏.连续泊位调度与岸桥配置协同优化[J].中国航海,2011,34(2):86-90. [6] 乐美龙,刘秀玲.基于泊位偏好与岸桥干扰的泊位和岸桥分配[J].运筹与管理,2014,(1):90-100. [7] Han X L, Lu Z Q, Xi L F. A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic handling time[C]. International Conference on Computers & Industrial Engineering. IEEE, 2010. 74-79. [8] Vacca I, Salani M, Bierlaire M. An exact algorithm for the integrated planning of berth allocation and quay crane assignment[J]. Semaine Thérapeutique, 2013, 47(2): 148-161. [9] Han X L, Gong X, Jo J. A new continuous berth allocation and quay crane assignment model in container terminal[J]. Computers & Industrial Engineering, 2015, 89(C): 15-22. [10] Hsu H P. A HPSO for solving dynamic and discrete berth allocation problem and dynamic quay crane assignment problem simultaneously[J]. Swarm & Evolutionary Computation, 2016, 27(default): 156-168. [11] Lee D H, Wang H Q. Integrated discrete berth allocation and quay crane scheduling in port container terminals[J]. Engineering Optimization, 2010, 42(8): 747-761. [12] Song L, Cherrett T, Guan W. Study on berth planning problem in a container seaport: using an integrated programming approach[J]. Computers & Industrial Engineering,2012,62(1): 119-128. [13] Unsal O, Oguz C. Constraint programming approach to quay crane scheduling problem[J]. Transportation Research Part E Logistics & Transportation Review,2013,59(59): 108-122. [14] Lu Z, Han X, Xi L. Simultaneous berth and quay crane allocation problem in container terminal[J]. Journal of Computational & Theoretical Nanoscience,2011,4(6): 2113-2118. [15] Rodriguez-Molins M, Ingolotti L, Barber F, et al. A genetic algorithm for robust berth allocation and quay crane assignment[J]. Progress in Artificial Intelligence, 2014, 2(4): 177-192. [16] Meisel F, Bierwirth C. A framework for integrated berth allocation and crane operations planning in seaport container terminals[J]. Transportation Science, 2013, 47(2): 131-147. [17] 刘鹏.考虑潮汐影响的离散型泊位和岸桥联合动态调度研究[D]. 大连海事大学,2014. |