[1] Hall N G, Potts C N. Supply chain scheduling: Batching and delivery[J]. Operations Research, 2003, 51: 566-583. [2] Chen Z L. Integrated production and outbound distribution scheduling: review and extensions[J]. Operations Research, 2010, 58: 130-148. [3] Wang H, Lee C Y. Production and transport logistics scheduling with two transport mode choices[J]. Naval Research Logistics, 2005, 52(8): 796-809. [4] Stecke K E, Zhao X. Production and transportation integration for a make-to-order manufacturing company with a commit-to-delivery business mode[J]. Manufacturing & Service Operations Management, 2007, 9(2): 206-224. [5] Agnetis A, Aloulou M A, Fu L L. Coordination of production and interstage batch delivery with outsourced distribution[J]. European Journal of Operational Research, 2014, 238(1): 130-142. [6] Koç U, Toptal A, Sabuncuoglu I. Coordination of inbound and outbound transportation schedules with the production schedule[J]. Computers & Industrial Engineering, 2017, 103: 178-192. [7] Guo Z, Zhang D, Liu H, et al. Green transportation scheduling with pickup time and transport mode selections using a novel multi-objective memetic optimization approach[J]. Transportation Research Part D ,2018, 60: 137-152. [8] Ji M, Ji F, Zhang W, et al. Logistics scheduling to minimize the sum of total weighted inventory cost and transport cost[J]. Computers & Industrial Engineering, 2018, 120: 206-215. [9] Agnetis A, Aloulou M A, Fu L L. Production and interplant batch delivery scheduling: dominance and cooperation[J]. International Journal of Production Economics, 2016, 182: 38-49. [10] Hall N G, Lesaoana Potts C N. Scheduling with fixed delivery dates[J]. Operations Research, 2001, 49(1): 134-144. |