Research on Airport Task Assignment Modeling and Simulation on Multi-factor Analysis
TIAN Qiannan1,2, LI Jie3, LI Kunpeng3, GUO Qun1,2
1. Hubei Logistics Development Research Center, Hubei University of Economics, Wuhan 430205, China; 2. Hubei Corporate Culture Research Center, Hubei University of Economics, Wuhan 430205, China; 3. School of Management, Huazhong University of Science and Technology, Wuhan 430074, China
TIAN Qiannan, LI Jie, LI Kunpeng, GUO Qun. Research on Airport Task Assignment Modeling and Simulation on Multi-factor Analysis[J]. Operations Research and Management Science, 2024, 33(2): 1-8.
[1] 中国民用航空局.2019年民航行业发展统计公报[R/OL].(2020-06-07)[2021-07-07]. http://www.ccaonline.cn/zhengfu/zftop/590599.html. [2] IP W H, WANG D, CHO V. Aircraft ground service scheduling problems and their genetic algorithm with hybrid assignment and sequence encoding scheme[J]. IEEE Systems Journal, 2013, 7(4): 649-657. [3] PADRON S, GUIMARANS D, RAMOS J J, et al. A bi-objective for scheduling ground-handling vehicles in airports[J]. Computer & Operations Research, 2016, 71: 34-53. [4] 樊玮,吴建波,衡红军.基于多Agent的机场地面服务车辆调度方法研究[J].计算机应用与软件,2015(10):256-259. [5] 彭瑛,胡明华,李印风.基于航班时刻优化的跑道运行容量提升方法[J].系统工程理论与实践,2014,34(10):2695-2700. [6] 张建同,杨文娟.基于优先级的进离港飞机排序优化问题研究[J].运筹与管理,2018,27(6):115-121. [7] 胡玉真,张耸.基于多目标规划的飞机路径恢复最优化算法研究[J].运筹与管理,2020,29(9):10-17. [8] CHU C K, CHAN C H. Crew scheduling of flight rail transit in Hong Kong: From modeling to implementation[J]. Computer & Operations Research, 1998, 25(11): 887-894. [9] DETIENNE B, PERIDY L, ERIC P,et al. Cut generation for an employee timetabling problem[J]. European Journal of Operational Research, 2009, 197(3): 1178-1184. [10] LUCA D G, JOHANNES G, GUY K. The minimum shift design problem[J]. Annals of Operations Research, 2003, 155(1): 79-105. [11] TOMMY C. A rule-based local search algorithm for general shift design problems in airport ground handling[J]. Transportation Engineering Journal, 2010, 35(6): 189-199. [12] 付晓薇,郭强,马芹芹.一类非确定型多目标指派问题及其算法研究[J].运筹与管理,2013(6):34-38. [13] JIANG Y, XU X, ZHANG H, et al. Taxiing route scheduling between taxiway and runway in hub airport[J]. Mathematical Problems in Engineering, 2015(5): 925139. [14] LI W L, LI K P, RAM P N, et al. Simultaneous product and service delivery vehicle routing problem with time windows and order release dates[J]. Applied Mathematical Modelling, 2021, 89(1): 669-687. [15] ZOU X, LIU L, LI K, et al. A coordinated algorithm for integrated production scheduling and vehicle routingproblem[J]. International Journal of Production Research, 2017(1): 1-20.