[1] 贾涛,刘静,徐渝.考虑路径腐败的可重复装货易腐品库存——路径模型[J].运筹与管理,2012,21(5):1-7. [2] Padmanabhana G, Prem Vratb. EOQ models for perishable items under stock dependent sellingrate[J]. Operational Research, 1995, 86(2): 281-292. [3] Claassen G D H, Beek P Van. Planning and scheduling packaging lines in food industry[J]. European Journal of Operational Research, 1993, 70(2): 150-158. [4] Sabah U, Randhawa, Cynthia Juwono, Sheikh Burhanuddin. Scheduling in multistage flowshop systems: an application in the food processing industry[J]. Industrial Management & Data System, 1994, 94(5): 16-24. [5] Soman C A, Donk D P Van, Gaalman G J C. Combined make-to-order and make-to-stock in a food production system[J]. International Journal of Production Economics,2004, 90(2): 223-235. [6] Soman C A, Donk D P Van, Gaalman G J C. Capacitated planning and scheduling for combined make-to-order and make-to-stock production in the food industry: an illustrative case study[J]. International Journal of Production Economics, 2007,108(2): 191-199. [7] Bilge Bilgen, Yelda elebi. Integrated production scheduling and distribution planning in dairy supply chain by hybrid modelling[J]. Annals of Operations Research, 2013, 211(1): 55-82. [8] Chen Huey Kuo, Hsueh CheFu, Chang Mei Shiang. Production scheduling and vehicle routing with time windows for perishable food products[J]. Computer & Operations Research, 2009 36(7): 2311-2319. [9] Nragess Shivvani, RubénRuiz, Shahram Shadrokh. Cyclic scheduling of perishable products in parallel machine with releasedates, duedates and deadlines[J]. International Journal of Production Economics, 2014, 156: 1-12. [10] Jeffrey W, Ohlmann, Barrett W, Thomas. A compressed-annealing heuristic for the traveling salesman problem with time windows[J]. INFORMS Journal on Computing, 2007,19(1): 80-90. [11] Pinedo, Michael, Singer, Marcos. A shifting bottleneck heuristic for minimizing the total weighted tardiness in a job shop[J]. Naval Research Logistics, 1999, 46(1): 1-17. [12] 陈荣秋,等.生产运作管理[M].第二版.北京:科学出版社,2009年. [13] 纪树新,钱积新,孙优贤.遗传算法在车间作业调度中的应用[J].系统工程理论与实践,1998,5:34-39. [14] 王飞军,吕建新,杨建伟.基于蚁群算法的农产品配送车辆调度问题研究[J].中国农机化学报,2014,35(1):57-61. [15] Lenstra J K, Kan A H G, Rinnooy, Brucker P. Complexity of machine scheduling problems[J]. Annals of Discrete Mathematics, 1977, 1: 343-362. |