LIU Hao, ZHANG Jingwen, CHEN Zhi, LI Heng. Optimization of Project Scheduling with Limited Construction Site in a Carbon Trading Scheme Based on Deep Reinforcement Learning[J]. Operations Research and Management Science, 2025, 34(12): 100-106.
[1] 中国建筑节能协会建筑能耗与碳排放数据专委会.2022中国建筑能耗与碳排放研究报告[R].重庆:中国建筑节能协会,2022. [2] BARATI K, SHEN X. Operational level emissions modelling of on-road construction equipment through field data analysis[J]. Automation in Construction, 2016, 72: 338-346. [3] WU X, CHE A. A memetic differential evolution algorithm for energy-efficient parallel machine scheduling[J]. Omega, 2019, 82: 155-165. [4] ZHANG W, ZHENG Y, AHMAD R. An energy-efficient multi-objective scheduling for flexible job-shop-type remanufacturing system[J]. Journal of Manufacturing Systems, 2023, 66: 211-232. [5] LI J, HAN Y, GAO K, et al. Bi-population balancing multi-objective algorithm for fuzzy flexible job shop with energy and transportation[J]. IEEE Transactions on Automation Science and Engineering, 2024, 21(3): 4686-4702. [6] HOSSEINIAN A H, BARADARAN V. An energy-efficient mathematical model for the resource-constrained project scheduling problem: An evolutionary algorithm[J]. Iranian Journal of Management Studies, 2019, 12(1): 91-119. [7] MORILLO D, BARBER F, SALIDO M A. Mode-based versus activity-based search for a nonredundant resolution of the multimode resource-constrained project scheduling problem[J]. Mathematical Problems in Engineering, 2017, 2017: 4627856. [8] DU B, TAN T, GUO J, et al. Energy-cost-aware resource-constrained project scheduling for complex product system with activity splitting and recombining[J]. Expert Systems with Applications, 2021,173: 114754. [9] 刘洪海,吁新华.基于沥青路面施工质量的设备合理匹配技术研究[J].筑路机械与施工机械化,2007,24(7):23-27. [10] ZHENG H, WANG L. Reduction of carbon emissions and project makespan by a Pareto-based estimation of distribution algorithm[J]. International Journal of Production Economics, 2015, 164: 421-432. [11] 张静文,刘婉君,李琦.基于关键链改进搜索的遗传算法求解分布式多项目调度[J].运筹与管理,2021,30(3):123-129. [12] 张豪华,白思俊.基于MAS的多模式分布式资源约束多项目调度[J].运筹与管理,2024,33(1):9-15. [13] MORI M, TSENG C. A genetic algorithm for multi-mode resource constrained project scheduling problem[J]. European Journal of Operational Research, 1997, 100(1): 134-141. [14] WANG L, FANG C. An effective estimation of distribution algorithm for the multi-mode resource-constrained project scheduling problem[J]. Computers & Operations Research, 2012, 39(2): 449-460.